Original source · versioned page text
18-0165B Stormwater Management Report_Issue D
Attached to the e-mail Amended stormwater management report - 5, 12 & 18 Taylor Court, Cooroy (MCU18/0120 & RAL18/0013 OPW18/0197) Existing landuse parameter or MUSIC.
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
13 AMENDMENT OF THE STORMWATER MANAGEMENT PLAN
Amendments may only be implemented with the consent of the preparing engineer (HR Design). Any amendments
without permission shall be the sole responsibility of the person making the amendment.
14 REPORT OWNERSHIP
This report has been prepared for the client/s listed at the beginning of the report. Use of this report by any other party
is prohibited without the express written permission of HR Design. HR Design retains the ownership of this report until
such time that all outstanding fees and monies have been received at the office of HR Design.
15 REFERENCES
1. Noosa Shire Council, Plan – 2006
2. Noosa Shire Council, Infrastructure Mapping
3. Queensland Urban Drainage Manual (QUDM), 2013
4. Australian Government – Bureau of Meteorology.
5. Queensland Department of Primary Industries (DPI)
6. WSUD technical design Guidelines Southeast Queensland Version 1- June 2006
7. Water By Design’s – MUSIC Modelling Guidelines, Version 1.0 (2010)
8. MUSIC version 6.3.0 modelling software by eWater
Yours sincerely, Certified by,
Benjamin J. Winning BEngTech (Civil), TMIEAust Barry R. Cromar BEng (Civil), MIEAust CPEng RPEQ NER
Dated: 7 November, 2018. Dated: 7 November, 2018.
HR DESIGN Reference No: 18-0165D Page 14 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.