18-0165B Stormwater Management Report_Issue D
Attached to the e-mail Amended stormwater management report - 5, 12 & 18 Taylor Court, Cooroy (MCU18/0120 & RAL18/0013 OPW18/0197) Existing landuse parameter or MUSIC.
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
3 PROPOSED DEVELOPMENT The proposed development will consist of three (3) industrial buildings being constructed of tilt-up concrete panels, together with hardstand and car parking areas. Landscaped areas will be provided throughout the development. One WSUD devices in the form of a bio-swale and a bio-retention basin sized to treat the development runoff will be constructed to the southern and western boundaries of the allotment. 4 SITE ACCESS Access to and exit from the site and will be via new crossovers to Taylor Court. These crossovers are designed in accordance with IPWEAQ standard drawing SEQ RS-051. Turning path diagrams for the design vehicles, (19m articulated vehicle), are shown on the attached engineering drawings 18-0165 Sheet C07. All access driveways, carparks and associated hardstand areas will be constructed of reinforced concrete. 5 SEWERAGE RETICULATION An existing gravity sewer main exists within the allotment at levels sufficient to command the proposed development. 6 WATER SUPPLY The proposed development will be readily serviced by an existing water main located within Taylor Court, adjacent to the eastern boundary. HR DESIGN Reference No: 18-0165D Page 4 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.