Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

18-0165B Stormwater Management Report_Issue D

Attached to the e-mail Amended stormwater management report - 5, 12 & 18 Taylor Court, Cooroy (MCU18/0120 & RAL18/0013 OPW18/0197) Existing landuse parameter or MUSIC.

of 35

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

7    STORMWATER QUANTITY MANAGEMENT

7.1 Discharge Goals

The following goals are to be achieved as part of the management of stormwater quantity:

    •   The quantity of storm discharged from the site is to have non-worsening effect on the existing stormwater
        system.


7.2 Legal Point of Discharge

The legal point of discharge for this site is the existing drainage infrastructure located in the south-west corner of the
allotment. This infrastructure includes a 525∅ RCP discharging directly into the existing drainage easement located
adjacent to the western and southern boundaries.




                                   Figure 2 - Legal Point of Discharge (source NSC mapping)




HR DESIGN                                           Reference No: 18-0165D                                      Page 5 of 15
Log in to download the original file

18-0165B Stormwater Management Report_Issue D.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.