Original source · versioned page text
18-0165B Stormwater Management Report_Issue D
Attached to the e-mail Amended stormwater management report - 5, 12 & 18 Taylor Court, Cooroy (MCU18/0120 & RAL18/0013 OPW18/0197) Existing landuse parameter or MUSIC.
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
7 STORMWATER QUANTITY MANAGEMENT
7.1 Discharge Goals
The following goals are to be achieved as part of the management of stormwater quantity:
• The quantity of storm discharged from the site is to have non-worsening effect on the existing stormwater
system.
7.2 Legal Point of Discharge
The legal point of discharge for this site is the existing drainage infrastructure located in the south-west corner of the
allotment. This infrastructure includes a 525∅ RCP discharging directly into the existing drainage easement located
adjacent to the western and southern boundaries.
Figure 2 - Legal Point of Discharge (source NSC mapping)
HR DESIGN Reference No: 18-0165D Page 5 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.