18-0165B Stormwater Management Report_Issue D
Attached to the e-mail Amended stormwater management report - 5, 12 & 18 Taylor Court, Cooroy (MCU18/0120 & RAL18/0013 OPW18/0197) Existing landuse parameter or MUSIC.
Original PDF page 7, section 1. The text section number identifies this passage in the reader.
7.3 Non-worsening of Peak Discharge
Using the ‘Rational Method’ as per QUDM, the pre-developed and post-developed site runoff calculations are listed in
the following table:
Table 1 - Catchment Details
t c (min) 5 ARI 10 years 20 years 50 years 100 years
1
I 10 (mm/hr) 70.2 AEP 10% 5% 2% 1%
i
C y (=F y .C 10 ) <1 I y (mm/hr) 215 245 285 316
i
Q y =(C y . I y .A)/3600 (l/s) Fy 1 1.05 1.15 1.2
Catchment Area (m 2 ) fi C 10 Cy Q y (l/s) Cy Q y (l/s) Cy Q y (l/s) Cy Q y (l/s)
Pre Development 10540 0 0.7 0.7 440.6 0.735 527.2 0.805 671.7 0.84 777.1
Post Development 10540 0.9 0.88 0.88 553.9 0.924 662.8 1 834.4 1 925.2
Post development discharge increase Q 10% (post) 113.3 Q 5% (post) 135.6 Q 2% (post) 162.7 Q 1% (post) 148.0
Referring to the stormwater infrastructure design drawings, by Leddy Sergiacomi & Associates Pty Ltd (Ref. No.
3
45113-C22), the existing 525∅ RCP has been designed to convey an expected stormwater discharge of 0.8m /s.
Table 1 shows that the developed site, if left unmitigated, is likely to result in an increase of up to 162.7L/s during the
Q2% storm event and up to 148L/s during the Q1% storm event. To mitigate any potential impact that this increase in
peak discharge runoff may have to the existing drainage infrastructure during the Q2% and Q1% storm events, on-site
detention and harvest & re-use tanks are proposed to be installed to collect all roof water from each building.
Roof water not detained for re-use will be discharged through restricted office plates, sized accordingly to reduce flows
to predevelopment levels
The proposed stormwater pipe network for the subject site is shown on the attached engineering drawings 18-0165
Sheets C03 & C04.
HR DESIGN Reference No: 18-0165D Page 6 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.