Skip to the record
Search everything, all in one place.

Original source · versioned page text

2017-08-17 Ordinary Meeting Agenda

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                            17 AUGUST 2017


          a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                immediately; or
          b.    where otherwise, upon completion of the works associated with the
                development.
          Any repair work which proposes to alter the alignment or level of existing services
          and assets must first be referred to the relevant service authority for approval.
    FOLLOWING CONSTRUCTION
          Certification
    59.   Upon completion of the work a certificate must be issued by an RPEQ certifying that
          the works have been constructed in accordance with the Operational Works permit.
    60.   A final inspection and approval of the new works and completed reinstatement works
          by Council’s Inspector is required. Please contact Council on 5329 6245 to arrange
          for the inspection.



2   MCU17/0035 APPLICATION FOR A DEVELOPMENT PERMIT FOR A MATERIAL
    CHANGE OF USE OF PREMISES OPEN SPACE TYPE 2 CAMPGROUND FOR 240
    WILDERNESS TRACK AND ROAD 205 NOOSA NORTH SHORE
    That Council note the report by the Coordinator Planning to the Planning & Environment
    Committee Meeting dated 8 August regarding Application No. MCU17/0035 for a
    Development Permit for Material Change of Use of Premises - Open Space Type 2
    Campground situated at 240 Wilderness Track, Noosa North Shore and approve the
    application in accordance with the following conditions:
          When Conditions must be Complied With
    1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with
          prior to the use commencing, and then compliance maintained at all times while the
          use continues.
          Approved Plans
    2.    Development undertaken in accordance with this approval must generally comply
          with the approved plans of development. The approved plans are listed in the
          following table unless otherwise amended by these conditions.
           Plan No.             Rev.   Plan/Document Name                           Date
           D-02174-01-C                Proposal Concept Plans                       24/04/2016
          Use
    3.    Resident guests of the campground must not stay longer than 12 weeks in a year.
    4.    The maximum number of camp sites permitted is 200 on site at any one time.
          Environmental Health
    5.    Sanitary Facilities are to be installed to the following requirements:
          a.    Unless an accommodation is fitted with a sanitary convenience, as a minimum
                standard provide for the exclusive use of the park occupants separate sanitary
                conveniences for each sex in accordance with the table below; and




                                                                                     Page 17 of 89
Log in to download the original file

2017-08-17 Ordinary Meeting Agenda(PDF, 9MB).pdf · 9.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.