ORDINARY MEETING AGENDA 17 AUGUST 2017
b. The driveway must be constructed so as not to concentrate or redirect
stormwater runoff onto neighbouring properties.
c. Underground service conduits for water supply, electricity and any other
services must be provided as part of the access driveway.
d. Where there is an existing pedestrian path, a matching crossfall must be
provided for the driveway on the alignment of the path, for the full width of the
path.
e. The property access must be located a minimum of 1m clear of existing power
poles, streetlights or other signage. The developer is responsible for any
necessary relocation of existing services to provide this clearance and must
contact the relevant service authorities and comply with their requirements in
relation to these works.
Earthworks and Retaining Walls
51. All earthworks shall be undertaken in accordance with the provisions of AS 3798
Guidelines on Earthworks for Commercial and Residential Development, with
geotechnical testing undertaken in accordance with Section 8 of the Standard, and to
a minimum of ‘Level 1’ as defined in Appendix B. Test results as required by AS
3798, and a certificate of quality and uniformity of fill shall be provided by a RPEQ
and submitted to Council prior to Council signing the Plan of Survey.
Stormwater Drainage
52. Appropriate scour protection must be provided at the outlet of all stormwater pipes
including temporary outlets.
53. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (e.g. by blocking or interfering with natural overland
flows).
54. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
Environment
55. Prescribed Water Contaminants (as defined in the Environmental Protection Act
1994) must not be released from the site or to waters within the site, or be likely to be
released should rainfall occur, unless all reasonable and practicable measures are
taken to prevent or minimise the release and concentration of contamination.
56. Erosion and sediment control measures must be installed and maintained to minimise
erosion on the site and to minimise the export of sediment and associated pollutants
from the site. The erosion and sediment control measures must be designed,
installed and maintained in accordance with current best practice standards (refer to
advisory notes).
57. Prior to the commencement of the use, all site surfaces must be effectively stabilised
using methods which have achieved effective short-term stabilisation and which will
continue to achieve effective stabilisation in the medium to long-term (refer to
advisory notes). For the purpose of this condition, an effectively stabilised surface is
defined as one that does not, or is not likely to result in visible evidence of soil loss
caused by sheet, rill or gully erosion or lead to sedimentation, or lead to water
contamination.
Damage to Services and Assets
58. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
Page 16 of 89
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.