ORDINARY MEETING AGENDA 17 AUGUST 2017
d. The use of gravity stormwater drainage only and not surcharge pits or
pumps.
30. Stormwater runoff from the development must be disposed of without causing
scour or damage to the subject site or any adjoining property.
Electricity and Telecommunication Services
31. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits,
pits and pipes to accommodate the future connection of optic fibre technology
telecommunications.
32. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Easements
33. A 3 metre wide easement for “Public Thoroughfare” purposes must be
registered against the title of the property in favour of Council. The easement
must be located adjacent to the northern boundary of the subject property. The
easement must:
a. Be clearly shown on all plans submitted for Operational Works.
b. Be registered prior to the commencement of the use.
c. The terms of the easement must allow for the use of the easement by the
public whether in vehicles, cycles or on foot.
34. Unless otherwise agreed in writing by the relevant service provider, any public
or third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
35. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the
Grantee’s standard easement terms. Draft easement documentation must be
submitted to Council for endorsement.
36. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
37. All earthworks, associated batters and retaining walls must be undertaken in
accordance with an Operational Works approval, and must in particular:
a. Be undertaken in compliance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential
Developments.
b. Be carried out in accordance with a site-specific Geotechnical
Investigation Report prepared by a suitably qualified person* that
addresses, in particular:
i. the impact of excavation and the construction works on the stability
of nearby building and infrastructures
ii. Acid Sulfate Soil assessment report in accordance with State
Planning Policy 2/02 Planning and Managing Development
Involving Acid Sulfate Soils and supported by appropriate testing
and documentation.
Page 25 of 89
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.