Council archive · source document
07/2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published] · 172007.2179
INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
Foe more information refer to Guide 18, For
information about prescnded tidal work refer to
Guide 24.
If you answered “YES” to Q12, the application
triggers referral to the Port Authority.
The Part Authority is a concurrence agency if the
development is -
© within 200m of a shipping channel or an eniry
and exit shipping corridor for the port
© within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;
within 1000m of a planned port facility
identified in a land use plan approved under
the Transport Infrastructure Act 1994.
tn all other situation the Port Authority is an
advice agency.
Marinas
For more information refer to Guide 18. For
information about whether a marina is prescribed
tidat work refer to Guide 24. The local
government is the assassment manager for all
prescribed tidal work.
If you answered "YES" to 013, the application
triggers referral 1o Queensland Fire and Rescue
Service as an advice agency.
Tidal works in strategic port land tldal
areas
For more information refer to Guide 18.
Unless you answered “NO” to Q14, the relevant
Port Authorily is the assessment manager for the
application and the Environmentat Protection
Agency (EPA} and Queenstand Transport (QT}
are concurrence agencies for |he application.
13.
4.
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark! and within the limits of a port
a the Transport infrastructure Act 19947
NO
(DYES - complete Pat M of Form 1. o Part P of Form 1 if the work is prescribed tidal work
Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths? .
NO
(71 YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
Dogs the application involve tidal works within a strategic port land tidal area???
no |
(YES - complete Part M of Form
Heritage
For further information refer to Guide 19.
If you answered “YES” to Q15, the application
triggers referral to the Queensland Herilage
Council as concurrence agency for lhe
application.
Unless you answered “none of the above’ to
Q15{b), the applicalion involves referral to the
Environmental Protection Agency as an advice
agency for the application
15,
15(b)The application involves: (tick applicable boxes)
Does the application involve development in a heritage registered place as defined under the
Queensiland Heritage Act 1992?
(No
(11 YES - complete Part C of Form 1
(i) amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992:
reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
none of the above.
Ditii
wii
Declared catchment areas
For more information, including a list of the
declared catchment areas within Queensland,
refer to Guide 13.
Unless you answered “none of the above” to
Q46, the application requires assessment by the
Department of Natural Resources and Water
(NRW).
If an agency other than NRW is the assessment
manager for the application, NRW is 2
concurrence agency for the application in
retation to this matter
16.
The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)
Ci (i) reconfiguring a fot if any tot resulting from the reconfiguration is tess than 16 hectares;
C (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
of out an environmentally relevant activity under the Environmental Protection Act 1994;
(iii)
none of the above
18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Poltution) Regulation 1995.
20 Strategic port and tidal areas are the areas generally 50 metres seaward of high water mark adjacent to svategic port land.
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.