Council archive · source document
07/2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published] · 172007.2179
INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about prescribed tidal work in
local government tidal areas reter to Guide 24,
Uniess you answered “none of the above® to 09,
the application requires assessment by the
Environmental Protection Agency (EPA).
If an agency other than EPA is the assessment
manager {or the application, EPA is a
concurrence agency for the application in
relation to this matter.
Local government is the assessment manager
for all prescribed tidal work.
Operational work below high water
mark
For more information refer to Guide 18. For
more information about prescribed tidat work in
local government tidal areas refer to Guide 24,
Uniess you answered “none of the above” to
O10, the application triggers referral to
Queensland Transport (QT) (Maritime Safety
Qld) as a concurrence agency,
Local government is the assessment manager
for alt prescribed tidal work.
9,
iDAS Assessment Checklist, Version 20, 2 Aprit 2007
The application involves operational work that is: ( tick the applicable box/es}
(1 @ _ tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1: of
tidal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1:
oi
Diy
or
carried out within a coastal management district under the Coastal Act and for — compiete
Part M of Form.t if any box/es (a) to (i) below are ticked.
constructing or installing works in a watercourse between MHWS and HAT (e.
other than those works in tidal water) where the development has been determined not
to be assessable against the Wafer Act 2000;
constructing a canal intended to be connected to tidal waters;
Oa)
C) )
Ov)
O@)
Oe)
Ow
O@
Dh)
Oo
constructing an artificial waterway:
teclaiming land under tidal water,
disposing of dredge spoil or other solid waste material in tidal water:
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
constructing a bank or bund wall to establish a ponded pasture on fand, other
than State coastal land, above high-water mark; or
{iv) none of the above.
10. The application involves operational work that is: ( tick the anpticable boxes)
(7 {i) tidal work"3 as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; oF
(7 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; of
(C1 (iii) carried out within a coastal management district's under the Coastal Act and for -
iw) none o!
Oe
Ob)
Oe
disposing of dredge spoil or other solid waste material in tidal water - complete Part *
M of Form 1;
teclaiming land under tidal water - complete Part M of Form 1; or
constructing a canal, if the canal is associated with reconfiguring a lot - compiete
Part M of Form 1;
f the above.
Coastal management
For more information refer to Guige 18.
Unless you answered “none of lhe above” to
Q11, the application requires assessment by ihe
Environmenta! Protection Agency (EPA).
If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.
11.
The application involves: (tick the appiicable boxes}
a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district
a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -
« the construction of a new premises with a GFA‘ of at least 1000m?2
+ the entargement of the GFA of existing premises by more than 1000m?
reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
reconfiguring a lot” assessable under schedule 8 of the IPA and in connection with
the construction of a canal - complete Part M of Form 1
none of the above
oO
Di
Ditiiy
Ow
go)
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely oF partly within a local government tidal area
12 Cana! means canal as defined under the Coastal! Protection and Management Act 1995
13 Tidad work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partty within a loca! government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management disinet under the Coastal Protection and Management Act 1995, olher han an area declared as a
coastal management district under section 47(2) of that Act.
18 GFA is defined in sch 14 of the IPA to mean the grass floor area. For a definition of how to calculates GFA, go to the planning scheme against which the application 1s being assessea
17 Under $117 of the Coastal Protection and Management Act 1995, an application far reconfiguration, where the reconfiguration 1s associated with the construction of an artificial waterway. must be
accompanied by the application for the operational works to construct the artificial waterway.
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.