07/2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published] · 172007.2179

of 36

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal
management districts and fish habitat
areas

if you answered YES to Q5, and ticked any
boxes in Q6), your application ts required to be
assessed against and must comply with the Wild
Rivers Coda.

If you answered YES to Q5 and licked box j) in
Q6, your application is required to be referred to
the EPA.

Note: If specified works are proposed in a local
government area, il is prescribed tidal work - the
relevant loca! government will be the
assessment manager with the EPA as a
concurrence agency

lf you answered YES to Q5, and ticked box ii} or
it) in Q6, your application requires referral to
OPIF.

If you answered NO to Q5 and ticked box j} in
O86, the application wil! not be accepted.

If you answered NO to Q5, ticked box ii) in Q6
and the davelopmeat is necessary to install
authorised works or infrastructure where a
development permit is not required. or if a
required permil is held, the application must be
assessed against and musi comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
not be accepted.

{f you answered NO at Q5 and ticked box iii} in
Q6, ihe application may be made if the works are
in a PA, These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.

For more information about specified works reler
to Gyide 27

Residential, commercial or industrial
development

If you answered YES to Q7, your application is
Hot subject to wild river requirements. Provided
there are no other aspects of this development
thal require assessment against the relevant wild
tiver declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.

If you answered NO to Q7 and ticked either box
i) or fi) in Q8, the assessing agency ts the
relevant local government. The application must
be assessed against and must comply with ihe
Wild Rivers Code.

6,

IDAS Assessment Checklist, Version 20, 2 April 2007

Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)

(Jno Cl yes

The application is for one or more of the following:

(71 i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); or

(1 ii) Operationat works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1), OF

Di) Building or operational works in a fish habitat area (ensure you have completed Part Oz of Form 1).

Is the application for residential, commercial or industrial development in a designated urban

area?
CL) yes

mie

If NO, does the application for residential, commercial or industrial development involve:

oO i) a material change of use made assessable in a local government planning scheme
{ensure you have completed Part D of Form 1); or

(1 ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).

 

Animal husbandry activities

if you answered YES to 09 your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for animat husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wikd Rivers Act
2005 and refer to Guide 27.

Agricultural activities

If you answered YES to Q10, your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for agricultural activities will
Agt be accepted if proposed in a HPA. For more
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
22.

The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
jechniques is aot an agricultural activity as
defined under the Wild Rivers Act 2005 For
more information see Guide 27.

 

10.

Does the application involve a material change of use for animal husbandry activities (as defined @
under the Wild Rivers Act 2005) in a PA?

LNo

YES {ensure you have completed Part R of Form 1)

Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
aPA?

LNno

If YES is the application for:
Li) a material change of use: or
0 ii) operational works.

(yes (ensure you have completed Part Q of Form 1)

 

* Page 12

Used in these records

About this file

File size
7.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published].pdf · 7.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.