Council archive · source document
07/2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published] · 172007.2179
INTEGRATED PLANNING ACT 1997
Works that take overland flow water
The relevant wild river declaration wif siale
works that take overland flow water are either
self assessable or assessable, or are exempl
from wild river requirements.
if you ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
ang must comply with the code.
If you Scked Q13 ii) an application is not required
to be made however the works must comply with
the relevant setf-assessable section of ihe Wild
Rivers Code, otherwise the works become
assessable development for which an application
§8 required and musi be assessed by NRW.
against the relevant part of the Wild Rivers Code
and must comply with the code.
If you ticked Q13 iii) your application is not
subject to wild river requirements.
Applications for davetopment that is olher than
that stated to be assessable, self-assessable or
exempt will not be accepted.
13.
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overfand flow water in a HPA or an FMA?
Oo NO oO YES (ensure you have completed Past Ks of Form 1}
If YES, is the application for works stated in the relevant wild river declaration to be?
(J i) assessable works
{J ii) setf-assessable works
iti) exempt works
Works that interfere with overtand
flow water
The relevant wild river declaration will state
works lhat interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements,
If you ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
If you ticked Q15 fi) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
1s required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
Hf you licked Q15 iii) your application is not
Subject to wild river requirements.
Applications for development thal is other than
that slated to be assessable, self-assessable or
exempt will not be accepted.
Waterway barrier works
Applications for building or raising waterway
barrier works in a HPA will not be accepted.
Ifyou answered YES to 16, your application
mus( be assessed by OPIF against the Wild
Rivers Code and must comply wilh the code.
16.
Does the application involve works that interfere with overland flow water in a FMA?
Ljno (77 YES (ensure you have completed Part Kio of Form 1)
{f YES, is the application for works stated in the relevant wild rivers declaration to be?
(C1 i) assessable works
LD ii selt-assessable works
1 iii) exempt works
Does the application involve building or raising waterway barrier works in a PA?
(no [YES (ensure you have completed Part Os of Form 1)
Aquaculture (non ERA)
Applications for aquaculture in a HPA will not be
accepted,
It you answered YES to Q17, your application
must be assessed by OPIF against the Wild
Rivers Code and must comply wilh the code.
Works that interfere with water in a
watercourse
Note: If the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or stream diversion) will not
be accepled
In a PA, applications for instream dams and
weirs may be accepled in nominated waterways.
tf you ticked box ti} in Q19, your application wilt
not be accepted.
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.
More information and localions of nominated
waterways is available by contact NRW,
accessing the department's website
www.nrw.qid goy,au or contacting the
department by email on:
wild [email protected] the application involve aquaculture in a PA?
oO NO O YES (ensure you have completed Part O; of Form 1)
Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?
(ino
if YES,
(J i) The application is for an instream dam or weir; or
(1) Yes (ensure you have completed the relevant Part K of Form 1)
(ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.
Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.