Council archive · source document
07/2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published] · 172007.2179
INTEGRATED PLANNING ACT 1997 Environmentally relevant activities Most applications for an ERA in a HPA will nol be accepted. Applications which may be made require referral to the EPA. The assessment of some ERAs is assessed by NRW, others have been devolved to OPIF, NRW or delegated local government (see EPA website for more information on devolved ERAs} If you answered NO to Q20 you do not need to complete Qs 21-24 you answered YES to Q20 and the development is in a PA, your application must be assessed by the administering authority”! against the Wild Rivers Code and musi comply with the code, unless the proposal is for development where an appiicalion will not be accepted, or is exempt from wild river requirements (see Q2), You will be able to determine if an application will not be accepted for the development by answering 021 - Q24. If you answered NO to Q21, you do not need fo complete Q22. If you answered YES to Q21 you are required to complete Q22. lf you answered NO to Q22, the apptication will not be accepted. If you answered YES to 022, the application must be assessed by NRW against the Wild Rivers Code and must comply wilh the code. If you answered NO to Q23 and the development is proposed in the HPA the application will not be accepted. If you answered YES to 023, the application must be assessed by the EPA or NRW (as prescribed in schedule 8A of the IPA) against the Wild Rivars Code and must comply with the code. \f you answered YES to 024 the application will not be accepted, If you answered NO to Q24, your application must be assessed by NRW against the Wild Rivers Code and must comply with the code, Exempt ERAs in a designated urban area If the development is proposed in a designated urban area there may be no wild river requirements. See Section 2 Q2. Note: All applications that can be accepled must be assessed against and must comply with the Wild Rivers Code (other than exempt ERAs in a designated urban area), Documentation If you answered NO to Q25, your application may be subject to an informalion request and processing of ihe application may be delayed. 20. 21. 22, 25, IDAS Assessment Checklist, Version 20, 2 April 2007 Does the application involve an ERA? LJ No ts the application for an ERA 20 instream? (No (J Yes Is a quarry allocation notice held for the proposed ERA 20 instream? (1No (yes Does the application involve any of the following in a HPA? - i) a level 2 ERA 11, (and is for specified works or a residential complex) il) an ERA 19 (dredging) iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in the Wild Rivers Act 2005, and Environmental Protection Act 1994) iv) an ERA 22 (out of stream) (No (Yes Is the proposed development for ERA 20 (out of stream) and; — inaFMA; and — notlow impact; and — hot for a residential complex in the area, or for specified works. (no CJ yes CD YES (ensure you have completed Part G of Formt) Has documentation been included with the application describing how the applicant proposes to comply with the mandatory requirements, required outcomes, and/ or performance requirements as set out in the relevant part/s of the Wild Rivers Code? ime LJ yes 2 The administering authority may be either the EPA, or if devotved or delegated, the locat govemment, DPIF or NRW. Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.