Skip to the record
Accept no imitations.

Council archive · source document

07/2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published] · 172007.2179

of 36

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

KR

INTEGRATED PLANNING ACT 1897
Land owner's consent (if appiicabe)

SecSon 3.2.1(10){a) of the 1PA prescribes tiat 21

appication canviot be taken to be property made.

wihout the kaad owner's corisent

a copteation must ba support by the consent of

af and owner f the eppticalorinvotves:

“@ =~ a material change of user,

a reconfiguration of a lot

Gi) “work 00 land below high-water mark& ot within
acanal es dafinad undér the Coastal Protection’
and Management Act 19350r

ty work on ral comridor land defined under the

 

120. Land owner's.consent to the making of this application:

Part A, Version 2.2, 25 July 2005

 

 

 

 

 

 

 

 

 

 

 

   
  
 
 

“Resource eniillement (7 appécebe)
SecSon 3:2:1[10}(6) of the IPA prescribes that an
‘application cannot be taken to bé property made
without evidence of the resourte entitlement.
Adice fos completing G22

Refer to schedule 10 of tis Integrated Pienaing
Regtation 1998 that prescibes the nature of evidence’
required by she State in support of the lodging of fis
dexelopment application.

The information in ()} - {¥) 5 tear torte
required uniter (22 (8-4

Abe gory ratios be Hoe a0

 

22. Th splatn frei

       
  
 
   

- (i) “Signature of defegatediotiicer:

YES - go f9:022
by: regulationto be accompariied:by ‘evidence:. (ck applicabto Sox)
Ot 0 of the alloca tio: tort i wniilenieat "to, the Feésourcs

  
 

 

 

 

 

-amtach evidence

fésource is satisfied the development is is
fesoutes 38 te 73

 

 

 

 

 

 

 

 

Assessment triggers- Lo.
This checidist does (fot apply i the aipphcation:

the complefon of Parts-A and
_mas be completed for sie, apteaions:

Plans / drawings { réports |

An application shoits be accompatid by details to

 

“applica!

  
  
   

 

 

sipport

umtages, reerrél agencies ond any pinion viowin] -
“the eppficalion dufitig pubic ecrutiny or pubic
on ficaian lo underslaid the stage of the proposal

 

. é06-cary potential impact.

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide ail applicable information required by Part A
and any other relevant part of Farm 1.

OFFICE USE ONLY (appticable to assessment manager's}

[eer b&b So

 

  
 

 

 

 

To. n ertet St the-butdiig: wot referredto in this: sppcton
Date ofengagement / | — Accreditation Nuniber. Name: Signature:
Td dott’0 40 43nu 62

Used in these records

About this file

File size
7.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published].pdf · 7.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.