Council archive · source document
07/2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published] · 172007.2179
w INTEGRATED PLANNING ACT 1997 Past €, Version 2.1, 18 June 2007 Eormbi| DeveloomentfApplication Operational &/or building work assessable against a local government’s planning scheme Compretion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work assessable against a local government's planning scheme (including detailed engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does not involve assessment of a material change of use of premises af the same time). Nature of the works The types of work that are assessable against! a planning scheme are determined by the scheme for a particular local government and will vary across the State. To determine the types of work that are assessable under a particular planning scheme, contact the relevant local government. The information in Q2 is necessary for statistical and planning purposes. Nature of the application A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur. Portable Long Service Leave levy (if applicable) Prior to issuing a development permit for the works, the assessment manager is required by law to “sight" an approved form, issued by Qleave, which signifies that the PLSL levy has been paid. For further information refer to hitp/Avww.gleave.qid.gov.au 1. The application is seeking approval of (tick one (1) or both if applicable): M Building work assessable against a planning scheme - provide details of the aspects of building work (8.9. building height greater than 8.5m, building work on high landslip risk area) [Deck propsed within Coastal frokecton Arzo. | C1 Operational work assessable against a planning scheme - provide details of the nature of the operational work (e.g. roadworks; landscaping; drainage works; stormwater; water infrastructure; sewerage infrastructure; earthworks; clearing vegetation; signage) Is the application for operational work involving the creation of new lots? Ae [DYES - specify number of new lots to be created below [ Does the proposal involve the construction of a canal that is associated with reconfiguring a lot? Mino = Yes This pplication is for: (tick one (1) or both if applicable) Preliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage infrastructure, etc | ] / ldcsopment permit - provide delaits of the type of work eg. roadwork, stormwater, water and sewerage infrastructure, etc i work WW _coastot UJ . 5, Are the works subsequent to a previous development permit or preliminary approval? prottch an NO (YES - provide details of all previous approvals AVL, List of approval reference/s Date approved Date approval lapses t i | t ls payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal? [DYES - complete Q7 EANO - a7, 8&9. do not apply Has the PLSL levy been paid? (11 YES - complete a8 Oj NO ~ the applicable tevy must be paid before a development permit can be given for the works How much was paid? | | What is the receipt number of the payment?
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2179 - SUPERSEDED Preliminary Building Work Assessable Against The Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.