Council archive · source document
OPW15/0035 Operational Works application for driveway relocation
Very large file (12.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
PROPOSED DRIVEWAY ACCESS LOT4 & RP125028 - No.9 WEYBA ESPLANADE, NOC For GEOFF & REGINA ACTON UNUeMALL S102 YVW Ot Jayunod JUSUyo|enoq veK DRAWING INDEX col C02 C03 C04 cos C06 CONSTRUCTION MANAGEMENT NOTES SEDIMENT & EROSION CONTROL NOTES & DETAILS DETAIL LAYOUT PLAN STANDARD DETAILS 4 : 6 oyoet 0 sqanset soar’ SUBJECT SITE LOCALITY PLAN NOT TO SCALE CONSTRUCTION MANAGEMENT & SEDIMENT/EROSION CONTROL PLAN 2. ROADWORKS TITLE SHEET, LOCALITY PLAN AND STANDARD NOTES " PROVIDE SUBSOIL DRAINS AS SHOWN ON TYPICAL SECTIONS. MAYBE OMITTEO WHERE STORMWATER PIPES ARE SHOWN ON HYDRAULIC CONSULTANTS DRAWINGS. NOTIFY ALL RELEVANT AUTHORITIES PRIGR TO COMMENCEMENT OF WORK WITHIN EXISTING ROAD RESERVES, THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING SERVICES WITHIN THE SITE PRIOR TO COMMENCING WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING SERVICES WHETHER SHOWN ON THE DRAWINGS OR KOT. ALL WORK SHALL CONFORM WITH THE RELEVANT LOCAL AUTHORITY'S SPECIFICATIONS AND REQUIREMENTS, VERIFY SET OUT DIMENSIONS SHOWN ON THE DRAWINGS BEFORE SITE WORKS, CONSTRUCTION AND FABRICATION COMMENCES. REFER ANY DISCREPANCY TO THE ENGINEER BEFORE PROCEEDING WITH THE WORK ALL WORKMANSHIP ANO MATERIALS SHALL BE IN ACCORDANCE WITH THE CURRENT MAIN ROADS STANDARD SPECIFICATIONS AND DRAWINGS PROVIDE TRAFFIC MANAGEMENT, LINEMARKING AND SIGNAGE TO THE CURRENT "MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES"ZAS1742 REQUIREMENTS, ALL EXISTING SERVICES PROPERTY ACCESSES AND ROAD FURNITURE WITHIN AREA OF WORKS TO BE SUITABLY RELOCATED AND MADE GOOD & CLEARING OF VEGETATION: NO CLEARING SHALL BE CARRIEO OUT BEYOND THE EXTENT OF EARTHWORKS OR WHERE NECESSARY FOR SERVICES CONSTRUCTION WITHOUT THE WRITTEN APPROVAL OF THE SUPERINTENDENT, MILLABLE LOGS ARE TO BE REMOVED FOR SAWMILLING. SUITABLE MATERIAL IS TO BE MULCHEO FOR REUSE ON SITE, EARTHWORKS NOTE 6 8 PRIOR TO COMMENCEMENT OF ANY CUTTING OR FILLING, STRIP VEGETATION AND TOPSOIL FROM AREAS TO BE CUT OR FILLED TO A MINIMUM DEPTH OF 158mm, REFER TO THE GEOTECHNICAL REPORT REGARDING REMOVAL AND REPLACEMENT OF EXISTING FILLING MATERIAL, THIS NOTE SHALL APPLY TO THE SUBGRADE UNDER ALL ORIVEWAYS INCLUDING UNDER FILL BATTERS, FOLLOWING THE SITE STRIP ANO DRIVEWAY SET QUT THE ENGINEER SHALL BE CALLED 10 SITE TO DETERMINE THE PRESENCE OF ANY EXISTING FILL UNDER DRIVEWAYS AND ASSOCIATED BATTERS. PROVIDE A BACKHOE FOR THE TEST PIT EXPLORATION, THE ENGINEER MAY DIRECT EXISTING LOOSE FILL TO BE REMOVED AND RECOMPACTED, COMPACT AND PROOF ROLL ALL PREPARED SUBGRADE AREAS PRIOR TO PLACING ANY FILLING. ALL FILLING SHALL BE PLACEO IN MAXIMUM 150mm LOOSE LAYER THICKNESS WITH EACH LAYER COMPACTED TO AT LEAST 95 % RELATIVE COMPACTION AS MEASUREO BY THE STANDARD METHOD DESCRIBED IN AS 1269, ALL FILLING SHALL BE CLEAN EXCAVATED MATERIAL FREE FROM TOPSOIL AND VEGETATION, THE EXISTING SITE WON MATERIALS SHALL BE FREE FROM COBBLES OR ROCKS IN EXCESS OF 10mm NOMINAL SIZE, ANY IMPORTED FILL MATERIAL REQUIRED TO MAKE UP SHORTFALLS IN QUANTITIES SHALL BE CLEAN SOIL MATERIAL FREE FROM TOPSOIL, VEGETABLE MATTER AND OTHER DELETERIOUS MATERIAL. THE FILLING SHALL BE FREE FROM COBBLES OR ROCKS IN EXCESS OF 100mm NOMINAL SIZE, THE MATERIAL SHALL HAVE A MINIMUM SOAKED CBR OF 15. ALL EARTHWORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH AS 3798 WITH LEVEL 2 SUPERVISION AND CERTIFICATION, THE CONTRACTOR SHALL PROVIDE CERTIFICATION FROM A RPEQ QUALIFIED ENGINEER THAT THE WHOLE OF THE EARTHWORKS AND GEOTECHNICAL SUPERVISION COMPLIES WITH AS37598 FOR LEVEL 2 SUPERVISION NOTIFICATION AND INSPECTION PROTOCOLS EMPIRE ENGINEERING IS RESPONSIBLE FOR LIAISING WITH THE COUNCIL DELEGATE AT THE CRITICAL CONSTRUCTION INSPECTIONS ANO THE CONTRACTOR SHALL GIVE SUFFICIENT NOTICE, AS FOLLOWS: 1, PRE-START MEETING (MANDATORY) - MINIMUM 7 WORKING DAYS, 2, KEY CONSTRUCTION ACTIVITY INSPECTIONS (REFER BELOW) ~ MINIMUM 48 HOURS. 3, ON MAINTENANCE INSPECTION (WHERE SPEC'D BY COUNCIL AT THE PRE-START MEETING) ~ MINIMUM 5 WORKING DAYS. &. OFF MAINTENANCE INSPECTION (WHERE SPEC'D BY COUNCIL AT THE PRE-START MEETING) - MINIMUM S WORKING DAYS. 5. EMPIRE ENGINEERING IS LIKELY TO CONDUCT RANDOM SITE VISITS AT THEIR DISCRETION AS NECESSARY. ~ NO NOTICE. CONSTRUCTION ACTIVITIES TO BE INSPECTED INCLUDE (BUT ARE NOT LIMITED TO) THE FOLLOWING: 1. BULK EARTHWORKS INSPECTION STRIPPED TOPSOIL VISUAL AND PROOFROLL, SEDIMENT AND EROSION CONTROL MEASURES ARE USED AND MAINTAINED, CONTRACTOR TO SUBMIT CBR AND DENSITY TEST RESULTS COMPLIANT WITH AS37983, SUB-GRADE BOX INSPECTION. VISUAL AND PROGFROLL. CONTRACTOR TO SUBMIT CBR AND DENSITY TEST RESULTS, PRE-SEAL INSPECTION. MEASUREMENT, STRINGLINE, VISUAL AND PROOFROLL. CONTRACTOR TO SUBMIT CBR AND DENSITY TEST RESULTS. CONCRETE PAVEMENT INSPECTIONS: STEEL INSPECTION, MEASUREMENT. STORMWATER OUTLET: COMPLIANCE WITH THE DRAWINGS, PRIOR TO COMMENCING PIPE LAYING UPSTREAM, NMDERGROUNO CULVERT/CONDUIT ANO PIPES: CHECK BEDDING AND ALIGNMENT PRIOR TO BACKFILL ANO COMPACTION OF TRENCHES. eyrey THE CONTRACTOR SHALL GIVE SUFFICIENT NOTICE TO EMPIRE ENGINEERING PRIGR TO COMMENCEMENT ANO UPON COMPLETION OF EACH STAGE OF THE RELEVANT WORKS. CONSTRUCTION NOTES 1. CONSTRUCTION START DATE - 7.8.4. 1 2. CONSTRUCTION COMPLETION DATE ~ T.B,A. 3. HOURS OF OPERATION - 6:34am TO 6:30pm MONDAY TO SATURDAY, 4, 5 » CONSTRUCTION PROGRAM - SEE BELOW . DUST CONTROL MEASURES:- SA. AREAS OF CLEARING/ EARTHWORKS TO BE LIMITED TO THAT SHOWN ON OPERATIONAL WORKS PLANS, 5.2, PHYSICAL BARRIERS TO BE RETAINED. ie EXISTING VEGETATION/BUFFER ZONES. 5.3, SITE TRAFFIC CONTROL. CONSTRUCTION VEHICLE SPEED LIMITS ON UNSEALED TRACKS TO BE REDUCED TO {tkm/h OR FURTHER IF REQ. 5.6, EARTH MOVING EQUIPMENT MANAGEMENT. CONSTRUCTION EQUIPMENT TO BE POSITIONED STRATEGICALLY THROUGHOUT THE SITE TO MINIMIZE DUST POLLUTION IMPACT ON NEIGHBORING PROPERTY'S. WIND DIRECTION AND VELOCITY TO BE MONITOREO PERIODICALLY, 5.55 WATER TRUCK TO CYCLE WITHIN DISTURBED AREAS OF THE SITE ON A REGULAR BASIS. WEATHER CONDITIONS TO BE MONITOREO AND CYCLES TO BE INCREASED IF REQUIRED. 5.6. VEGETATION TO BE STABILIZEQ AS SOON AS PRACTICABLE AT THE COMPLETION GF BULK EARTHWORKS, CISTURBED AREAS TO BE SEEQED, EROSION AND SEDIMENT CONTROL MEASURES TO BE CONSTRUCTEO. 6. SITE FOREMAN DETAILS - T.8.A. ADDRESSING COMPLAINTS COMPLAINANT ee : FReae cucueaies Hecke COMPLAINT «= COMPLAINT = COMPLAINT + SITE FOREMAN 1.8.4. at. sree (Eso of RECTIFY ISSUE COMPLAINTS fede FLOW CHART | EE INFORM, INFORM COMPLAINANT sans FOR APPROVAL Date | OFF OS ie novels tte tokio sadion babe is (Cie EO REGIA ACTON | (Seszced SHO [orang [eeged 1) (rie Data WARCH 2015 [Sccte AS SHOWN wind canal oer BAA PRE BUNDABERG | GIADSTONE | SUNSHINE COAST | |7 , PROPOSED DRIVEWAY ACCESS ME amen TITLE SHEET, LOCALITY PLAN Job Ref No: | Drawing No:| Issue: ol mibeatin "| ENGINEERING Poaercs PRageneste pay No.9 WEYBA ESPLANADE ff AND STANDARD NOTES SC-5054 cot A i tgcenwn me TCE SRE eT m NOOSA TROY PAULSEN 7 RPEQ: 6990)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW15/0035 Operational Works application for driveway relocationRelated documentApplication case desk ↗
About this file
- File size
- 12.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.