OPW15/0035 Operational Works application for driveway relocation

of 30

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (12.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

 

AIR QUALITY
MANAGEMENT

NOISE
MANAGEMENT

VIBRATION
CONTROL

ON-SITE MACHINERY
SERVICING AND MAINTENANCE

STORAGE ANO HANDLING OF
DANGEROUS GOODS ON-SITE

WASTE
MANAGEMENT

VISUAL IMPACT
MANAGEMENT

SITE SECURITY AND PROTECTION
OF EMPLOYEES AND THE PUBLIC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ISSUE ~ INCREASED WSDBORNE SEDIMENT LOADS = PUBLIC ROISE RUISANCE EFRON CONSTRUCTION ~ -VIBRATION DAMAGE TO NEIGHBOURING ~ [POTENTIAL FOR SPILLAGE OR LEAKAGE OF » POTENTIAL FOR SPHLAGE OR LEAKAGE OF ~ APPROPRIATE DISPOSAL OF ALL CONSTRUCTION » LOSS OF VISUAL ANENTY DUE TO - UNAUTHORISEO ACCESS TO THE SITE LEADING
DURING THE CONSTRUCTION PHASE. VEHCLES ANO EQUPHENT. ‘STRUCTURES, CHEMICAL AND PETROLEUH PRODUCTS AND CHEMICAL AND PETROLEUN PROGUCTS AND SWE WASTE. CONSTRUCTION, MACHINERY AND EQUPHENT, TO VAHOAUSH, THEFT OR PERSONAL INJURY,
- WORKER. HEALTH AND SAFETY, - RUISAIKE, REGULATED WASTES TO WATERS, REGULATED WASTES TO WATERS,
OBJECTIVE = "TO REDUCE CONSTRUCTION IMPACTS ON AR = TO UNDERTAKE: ALL REASONABLE AND. ~ TO ENSURE GROUND ViBRATIONS 00 KOT ~ TO MINIMISE THE EFFECT OF ON-SITE ~ TO MEISE THE RISK OF HEALTH HAZARDS >. TO TAKE ALL REASONABLE ANO. PRACTICABLE = TO UNDERTAKE CONSTRUCTION USING ALL + TO UNIT ACCESS TO THE CONSTRUCTION SITE
QUALITY AND TO HECP MININISE INCONVENENCE PRACTICABLE: MEASURES TO PREVENT OR CAUSE OAHAGE TO ADJACENT BULONGS OR HACHINERY MAINTERAKCE. CAUSED BY THE STORAGE AND TRANSPORT STEPS YO RECUCE AND RECYCLE WASTE REASONABLE APO PRACTICABLE MEASURES TO FOR AUTHORISED PERSONAL DURNG WORKS:
‘TG NEIGHBOURING PROPERTIES. HIMHISE NOISE NUISANCE TO NEIGHBOURING CAUSE ANNOYANCE TG NEARBY RESIDENTS, + TO UNDERTAKE ALL REASONABLE AND ‘OF DANGEROUS GoODs. DURING THE CONSTRUCTION PHASE AND 10 HNHISE PACT ON VISUAL AREAITY, HOURS ONLY.
PROPERTIES, PRACTICAL MEASURES 10 HINMISE: = TO UNDERTAKE ALL REASONABLE ANO. DiSPGSE OF IT If AN APPROPRIATE MANNER, °
CONTAHNATION OF LAN AND WATERS, PRACTKAL HEASURES TO HNIMISE
CORTAMMATION OF LAND AIO WATERS.
PERFORMANCE | - STANDARD CONSTRUCTION HOURS SHALL SE ~ STANDARD CONSTRUCTION HOURS SHALL BE = STANDARD CONSTRUCTION HOURS SHALL BE » HO RELEASE OF CONTANHANTS TO LANO 08 ~ ALL DANGEROUS GOONS TO BE STORED, ~ ABSENCE OF WASTE AND LITTER OR THE » HINIMAL ADVERSE VISUAL IMPACT ~ KO UNAUTHORISED ACCESS YO THE
UNITED TO 7.00AM 10 £.06PM MONDAYS TO LIMITED TO 7.00AM TO 4.40PM MONDAYS TO ARITEO TO 7.09AH TO &06PH MONDAYS TO WATER, HARDLED AKD BSUNDED, ACCORDING TO CONSTRUCTION SITE, ACCESS ROAD AND: > NO EXCESSIVE COMPLARTS.. CONSTRUCTION SITE.
SATURDAYS UNLESS OTHERWISE AUTHORISED SATURGAYS, SATURDAYS, » AVOID ANY ADVERSE “EFFECTS OM THE AUSTRAUAN STANDARDS, NCLUONG AS52508, BUFFERS.
BY COURGL. . » NO UNREASONABLE NOISE RELEASES ~ VIBRATION IS TO COHPLY. WITH BS 66727 PR CONSTRUCTION SITE DUE TO THE AS1678, AS19463; AND AS23931, ~. NO COMPLARTS. -
» NO WORKS TO BE CARRIED OUT OK. A SUNDAY ~ IN ABSENCE GF QUANTITATIVE HONTORING SECTION 5.7 OF HRS 11.51 OR EQUYALENT. HACITENANCE AND SERVING OF MACHINERY. ~ NO RELEASE OF CONTAMINANTS TO LAHD AKO
OR PUGLC HOLIDAYS. BURNG THE CONSTRUCTION PHASE, NOISE ~ NO EXCESSIVE COMPLAINTS FROM WATER
~ QUST PLUNES CREATEO FROM THE LEVELS. ARE TO BE CONTROLLED TO ACCORD HEIGHBOURNG RESIDENCES
CONSTRUCTION SITE AND/OR HAULAGE OF WITH ACCEPTED INDUSTRY AND REGULATORY ~ RO UNREASOHABLE VIBRATIONS:
MATERIALS ARE TO GE. ELISRATEO REQUIRENENTS,
- NO COHPLAINTS FROM NEGHBCURS
CONTROL + PRIOR TO COMMENCEMENT OF CONSTRUCTION, ~ PRIOR. TO COHHENCENENT OF CONSTRUCTION, ~ PRIOR TO’ COMHENCEHENT OF CONSTRUCTION, + A BUNDED SERVKE AREA 1S REQURED FOR ~ DANGEROUS GOODS SHALL BE STORED + DESIGNATE A WASTE COLLECTION AREA OR- = RUBBISH ANO WASTE TO BE COLLECTEO FROM + ALL ACCESS TO THE SITE {5 TO BE VIA
MEASURES NEIGHBOURING RESIDENTS AND EHERGENCY HEIGHBOURING RESIDENTS AND. EHERGENCY NEIGHBOURING RESIDENTS. ANO EMERGENCY. HAINTENANCE AND SERVICNG -SIGMFICANT SEPARATELY IN BUNOEO AREAS KOT SITE THAT DOES. NOT RECEIVE A SUBSTANTIAL SHE . TRE HOMNATEO PONT ON PLAN
SERVICES SHALL BE NOTHIEO IN WRITING [BY SEAVICES SHALL BE NOTIFIEO IN WRITING (aY SERVICES SHALL BE NOTIFIED IX WRITKG (OY VEHICLE. MAINTENANCE SHALL BE CONDUCTED: ASSESSABLE TO UNQUALIFIED PERSONS: AKQUNT OF RUNOFF FROM UPLANG ASEAS = SURPLUS CONSTRUCTION MATERIAL TO BE = GARRICAGES AND: SAFETY FENCING SHALL BE
LETTER OROP} OF THE CONSTRUCTION PERIOD, LETTER, OROP} OF THE CONSTRUCTION PERIOD, LETTER DROP} OF THE CONSTRUCTION PERIOD, OFF-SITE AT APPROPRIATE FACILITIES, WITHOUT APPROPRIATE TRAINNG IN ITS ‘AND OGES NOT DRAIN ORECTLY TO WATER PROMPTLY REMOVED FROM CONSTRUCTION, ERECTED ARGUND THE SITE ANO ADJACENT
DESIGNATED WORKING HOURS AND CONTACTS: OESIGHATED WORKING HOURS AND CONTACTS ‘DESIGNED WORKING HOURS AND CONTACTS ~ UGNT MAINTENANCE MAY BE UNDERTAKEN 0% HAROLING AND FIRST AID PROCEGURES. Boo, ‘Site, TO PUBLK ACCESS WAYS. THE SITE ACCESS.
REGARDING COMPLAINTS OF EXCESSIVE AIR REGARDING CONPLAINTS OF EXCESSIVE NOISE, REGARDING COMPLAINTS OF EXCESSIVE SITE, IN THE GUNDED SERVICE AREA, » CHEMICAL DATA, HANDLING AND SAFETY. ~ ENSURE REGULAR COLLECTION OF ON-SITE ~~ VEGETATION DISTURBANCE TO BE HNMISED 45 10°8E GATED. ~GENERALLY, CONSTRIXTION
QUALITY DETERIORATION, ~ ADJACENT RESIOERCES ARE TO BE ADVISED OF VIBRATION, + THE CONTRACTOR 15 TG PROVIDE SUITABLE SHEETS FOR ALL DANGERCUS GOODS WILE BE WASTE. ACTIVATES: ARE 10 BE FERCEO/HOARDED!
» VEGETATIVE GROUND COVERS ARE. TO BE ANY WORKS TO BE CONDUCTED OUT OF THE + USE CONSTRUCTION TECKNQUES: THAT ACCESS SURFACING FOR ALL WEATHER KEPT RE THE SITE OFFICE. ~ DISPOSAL OF WASTE COLLECTION BINS ARE FROM ADJACENT PROPERTES,
MAINTAINED WHERE POSSIBLE STANDARD CONSTRUCTION HOURS HINGHSE THE NEED FOR BLASTING, ROCK PURPOSES, = ONLY NECESSARY QUANTITIES OF CHEMICALS, TO BE CLEARLY MARKED “CONVENTIONAL = THE CONSTRUCTION SITE COMPOUND IS 10 BE
» ACTIVITIES ARE TO ONLY BE CONOUCTED. + ALL CONSTRUCTION STAFF ARE TO HAVE BREAKING ARO PILE DRIVING, = SAFE HANDUNG TEGINQUES AND REQUREO FUELS AND OS SHOULD BE KEPT ON THE WASTE", “RECYCLABLE” AND “REGULATED LOCKED AT ALL TINES OUTSIDE OF WORK
OURING SUITABLE WEATHER CONDITIONS, ADEQUATE NOISE PROTECTION AS PER WORK UNDERTAKE GEOTECHNICAL INVESTIGATION AS. REFVELUING, CONSTRUCTION SITE AT ARY THE. WASTE", ERSURE THAT ALL CONTAINERS ARE HOURS.
~ A WATER TRUCK OR SPRAY APPARATUS {5 TO PLACE HEALTH ANO SAFETY, RECESSARY TO PREDCT YBRATION EFFECTS > WASTE OLS ARE TO BE COLLECTED AND ~ EQUPMENT IS TO BE AVAILABLE IN FUEL FITTEG WITH LIDS’ ~ THE SITE SHALL BE APPROPRIATELY
BE PROVIOEO ON SITE WHEN REQUIRED ALL PLANT AND MACHNERY USED DURNG OF CONSTRUCTION TECHNIQUES. TRANSPORTED TO RECYCLERS OR DESIGNATED: STORAGE AREAS AND IN VEHICLES TO. » REGULATEO WASTES SHALL BE SEALED IX A HANTAINED TO PROVIDE A SAFE WORK
=~ EXPOSED AREAS SUCH AS CLEARED AREAS CONSTRUCTION MUST BE FITTEO, WITH » UNDERTAKE ACTIVITES LIKELY 10. CAUSE DISPOSAL SITES. CONTAIN AND CLEAN UP ANY SPILLS THAT APPROPRIATE LICENSED 10: RECEIVE SUCH ENVIRONMENT FOR ALL PERSONAL, ViSITORS
ANO STOCKPILES, ARE TO BE WATERED ANO EXHAUST S'LEMCES OR NOISE SUPPRESSION VIBRATION. DURING NORMAL CONSTRUCTION + SERVIONG OF PLANT AXO EQUPHENT SHOULD MAY OCCUR, WASTE, AKO THE GERERAL PUBLIC,
KEPT DAMP IN ORDER TO HINMISE EROSION EQUPHENT, HUST BEAN GOOD OPERATING HOURS. BE UNDERTAKEN OUTSIOE OF NORMAL > RELEASE ANY CLEAN STORMWATER: = SCHEQULE WASTE COLLECTION 16 REQURED TO = APPROPRIATE WARRING SIGNS SHALL BE
OR THE POTENTIAL FOR DUST CREATION CONDITION ANO NEEL EMISSION STANDARDS, CONSTRUCTION HOURS, ACCUMULATED IN TEMPORARY BUNOED AREAS, PREVENT THE CONTAINERS FROM OVERFILLING, ERECTED FOR THE WORK FORCE ANO THE
~ VEHKLE SPEED 1S TO BE LIMITED ON SITE TO » HAULAGE ROUTES SHALL AVOD RESDENTIAL GENERAL PUBLIC TO HGHUGHT HAZAROOUS
MIRMSE DUST GENERATION AREAS AND USE DEDICATED ROUTES ROADS ACTIVITIES WITH, ANO AROUND THE SITE
= TRUCKS ENTERING GR EXITING THE SITE SHAUL WHERE POSSOLE INCLUDING: EXCAVATION: DEHOLITION: THE USE
HAVE THER LOADS COVERED OF EXPLOSIVES POWER TOOLS, EXPOSURE TO
= ALL CONSTRUCTION VEHICLES EXITING SITE HOGH NOISE EMISSIONS. STRICT HOUSEKEEPING
SHALL PASS THROUGH A WHEEL WASH: DOWN SHALL APPLY TO ALL ENTRIES USED FOR SITE
AND/OR. DRIVE OVER A 'SHAXE DOWN GRID ACCESS OR EGRESS, INCLUDING ENTRY 10 SITE
‘WHICH WILL BE LOCATED AT THE SITE SHEDS AND EMPLOYEES FACILITIES,
ENTRY/EXIT .
= HAULAGE ROUTES SHALL AVOIO RESIOENTIAL
AREAS AND USE SEALED ROADS WHERE
POSSIBLE
~ MAGHNERY SHALL BE FITTED DUST FALTERS
= ALL EQUPHENT AND VEHKLES, ARE TO HEET
RELEVANT EXESSION STANDARDS,
~ MAINTENANCE OF WIND BREAKS ANO BARRERS,
WHERE POSSIOLE
= “STOCKPRES HEIGHTS ARE 10 BE KEPT TO
MANAGEABLE HEIGHTS FOR OUST AND: EROSION
CONTROL: PURPOSES
» PROTECTION OF LONG TERM SOL STOCK PILES
WITH REVEGETATION, WATERNG/HOISTURE OR
HYDRO MULCHING WHERE PRACTICABLE
~ REVEGETATE AS SOON AS POSSIBLE
FOLLOWING CONSTRUCTION
RESPONSIBILITY | + THE CONTRACTOR HOLOS RESPONSBLTY FOR + THE CONTRACTOR HOLOS RESPONSIALITY FOR 7 THE: CONTRACTOR HOLDS RESPONSIBILITY FOR » TRE CONTRACTOR HOLOS RESPONSISILITY FOR: + THE CONTRACTOR HOLOS RESPONSIBILITY FOR + THE CONTRACTOR HOLDS RESPONSIBLITY FOR THE CONTRACTOR HOLDS RESPONSIBILITY FOR = THE CONTRACTOR (S RESPONSIGLE FOR THE
THE SITE THE SITE . THE SITE, THE SITE THE SITE. THE SITE. ‘THE SITE. DESIGNATED SITE COMPOUND SECURITY FENCING.
= THE PRINCIPAL [S RESPONSIBLE FOR PUBLIC ~- THE PRINGPAL IS RESPONSIBLE FOR PUBLK + THE PRINCIPAL 1S RESPONSIBLE FOR FENCING?
KOTIFICATION VIA A THE.LETTER. DROP NOTIFICATION VIA THE. LETTER OROP: HOARDNG TO THE ADJACENT PROPERTIES
MONITORING = THE CONTRACTOR SHALL CONDUCT DALY + A COMPLANTS REGISTER TO BE HARITAINEO, = THE CONTRACTOR IS: RESPONSIBLE FOR. = THE CONTRACTOR JS RESPONSIBLE FOR DALY = THE CONTRACTOR IS RESPONSIBLE FOR DAILY ~ DAILY VISUAL INSPECTIONS OF THE SITE ARE + REGULAR INSPECTIONS FOR UNREASONABLE » DAILY VISUAL INSPECTIONS OF THE SITE WAL
VISUAL INSPECTIONS OF THE SITE FOR DUST = ALL GENUINE NOISE COMPLAINTS SHALL BE FREQUENT INSPECTIONS OF THE SITE DURING VISUAL INSPECTIONS OF THE “SITE. VISUAL INSPECTIONS. OF THE SITE. ‘To BE Conducted. VISUAL IMPACTS, BE UNDERTAKEN FOR ADEQUACY OF SITE
PLUMES, . . INVESTIGATE AND ASSESSED 10 DETERMINE: TMPACT WORKS = REGULAR INSPECTIONS WILL BE UNGERTAKEN: + A COMPLANT REGISTER IS TO BE MAINTAINED SECURITY:
= A COHPLAINT REGISTER IS TO BE HAINTAINED: IF THE NOISE IS UNREASONABLE. SUCH OF ALL TEMPORARY CHEMICAL ANO PETROLEUM
INVESTIGATIONS HAY REQUIRE NOISE PRODUCT STORAGE AREAS FOR LEAKAGES
HONITORING TO DETERHNE IF A PROBLEN OF
BREACH EXISTS,
CORRECTIVE ~ CORRECTIVE ACTIONS WALL INLUDE A REVIEW ~ UNREASONABLE NOISE CAUSED BY HACHINERY ~ SHOULO COMPLAINTS ARISE, MEASURES SHALL = THE CONTRACTOR SHALL ENSURE ON-SITE ~ IF DAMAGED GOODS ARE SPLT, THE + PROHPT DELEGATION OF CLEAM UP WORKS. = VISUALLY OFFENSIVE COMPONENTS OF ~ RYSTALLATION OF INCREASED SECURITY
‘ACTIONS OF EXISTING CONTROL MEASURES FOR ISTO BE REKEOIED BY APPROPRIATE REPAIRS ‘BE TAKEN BY THE CONTRACTOR TO MODFY: MACHINERY 1S STOREO WITHIN THE SECURE CONTRACTOR SHALL ENSURE THAT THE AREA = INKREASEO VIGILANCE CONSTRIKTION SHOULO.BE IDENTFIEO AND IF HEASURES REQURED,
INADEQUACIES. AND. A MAINTENANCE SCHEOULE REVIEW. THE OFFENONG EQUPHENT OR MOOFY DESIGNATED COMPOUND AFTER WORKNG IS ISOLATED ANO KNIMISED, POSS@LE HODIFED IN CONSULTATION WITH
= SHOULO COMPLAINTS ARISE, THE CONTRACTOR ~ THE RELEVANT ACTIVITY MAY REQUIRE CONSTRUCTION PRACTKES TO ENSURE ‘HOURS, ~ PETROLEUM OR CHEMICAL SPLLAGES ARE TO KCHPLAINT.
‘SHALL ENSURE HEASURES ARE TAKEN TO MODIFKATION OR RELOCATION, VIBRATIONS ARE WITHIN. RELEVANT ~~ THE CONTRACTOR SHALL ENSURE ANY BE MMEDIATELY, CLEARED UP WITH
MODIFY THE OFFENDNG EQUPMENT OR MODIFY = SPECIFK MACHINERY HAY REQUIRE AN. “GUOELNES. UNAUTHORISED MAINTENANCE 1S CEASED ADSORBENT MATERIAL.
CONSTRUCTION PRACTICES TQ REDUCE OUST ALTERATION TO ITS HOURS OF OPERATION, THMEGIATELY AND MOVEO OFF~ SITE, ~ ABSORBENT MATERIALS USED FOR CLEAN UP
LEVELS WITHIN RELEVANT SGURDELINES: = TORRECTIVE ACTIONS WILL INCLUDE .A REVIEW ~ THE CONTRACTOR. SHALL ENSURE ANY AREA OR WASTE DARGERQUS GOODS ARE TO 6E
OF EXISTING CONTROL HEASURES FOR DANAGED BY HYOROCARGONS OR HAZARDOUS PLACED ARD SEALEG JH AN APPROPRIATE
ANADEQUACIES. CHEMKALS IS FENCED, EXCAVATED AND CONTAINER HARKED “REGULATED WASTE* AND.
- $N THE EVENT THAT A ROR-CONFORMANCE HAS: 'RENOVED FROM SITE TO A DESIGNATED. CONSIGNED TO A WASTE CONTRACTOR
OCCURRED AS A RESULT OF POOR WORK DUMPING AREA AND THE AREA UCENSED TO RECEIVE SUCH WASTE FOR
PRACTICES, PERSONNEL ONSITE WAL BE RE-ESTABLISHED DISPOSAL AT AK APPROVED FACHLITY.
MADE AWARE OF THE PROBLEM ANO JNFORHED ~ THE QAHAGEO AREA IS TO BE
OF ACCEPTABLE WORK PRACTICES, RE-ESTABLISHED:
REPORTING = WEEKLY-REPORTING BY THE PRACELE » WEEKLY REPORTING BY THE PRNCPLE = WEEKLY REPORTING BY TRE PRINCIPLE » WEEKLY REPORTING BY THE PRINCIPLE ~ WEEKLY REPORTING BY THE PRINCPLE = WEEKLY REPORTING BY THE PRINCPLE ~~ WEEKLY REPORTING BY THE PRINOPLE ~ WEEXLY REPORTING BY THE PRINCIPLE
CONTRACTOR T@ THE CONSULTANT COVERNG CONTRACTOR TO THE CONSULTANT COVERING CONTRACTOR: TO THE CONSULTANT COVERING CONTRACTOR 10 THE CONSULTANT COVERING CONTRACTOR 10 THE CONSULTANT COVERING CONTRACTOR TO THE CONSULTANT: COVERING CONTRACTOR TO THE CONSULTANT COVERING CONTRACTOR TO THE CONSULTANT COVERING
‘THE EFFECTIVENESS OF THE MANAGEMENT THE EFFECTIVENESS OF THE HMANAGEHENT TRE EFFECTIVENESS OF THE MANAGEMENT THE EFFECTIVENESS OF TRE MANAGEMENT THE EFFECTIVENESS OF THE MANAGEMENT TRE EFFECTIVENESS OF THE MANAGEHENT THE. EFFECTIVENESS OF THE MANAGEMENT ‘THE EFFECTIVENESS QF THE MANAGEMENT
SYSTEM AND NOTING ANY CORRECTIVE SYSTEM AND ROTING ANY CORRECTIVE SYSTEM AND NOTING ANY CORRECTIVE ‘SYSTEM ANO NOTING ANY CORRECTIVE SYSTEH AND NOTING ANY: CORRECTIVE ‘SYSTEM AND KOTING ANY CORRECTIVE ‘SYSTEM ANO NOJAG. ANY :CORRECTIVE SYSTEM AND NOTEG ANY CORRECTIVE
ACTIONS TAKEN ACTIGNS TAKEN ACTIONS TAKEN ACTIONS TAKEN ACTIONS TAKEN ACTIONS TAKEN ACTIONS TAKEN ACTIONS TAKEN
as
TOES ony ate eee, eat ea ibe 5 (tient: GEOEF & REGRA ACTON ) (Pasisaed “SHO [orgs an [ergeres. TGP) (Titte: (Date, HARCH 2015 [stale AS SHOWN)
cngetrmaai cece Sel E AA PARE eeaomas GIADSTONE SUNSHINE COAST | |r ici PROPOSED DRIVEWAY ACCESS ‘Spereved CONSTRUCTION MANAGEMENT NOTES Job Ref Rox | Drawing Wo:| _fssue
fet teteae petaiten ef Phe angeee. lelrogeaet FORA EE Badder SU | POR O GaeecSCGd ent Bobet Webel GT et Rod WEYSA ESPLANADE jE
2 Soets thet he waicecr tre yeh ENGINEERING [me Tae hae "on : SC-5054 €02 A
Date [ore ) (a vetp et oeancve mate SES Faye AIS ee KoOSA TROY PAULSEN 7 PEG: 6990 }

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
12.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW15_0035 Operational Works application for driveway relocation.pdf · 12.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.