EROSION AND SEDIMENT CONTROL
PROGRAM
1. THIS PROGRAM ANO ASSOCIATED PLANS SHALL BE READ IN CONJUNCTION WITH THE
SHE NANAGEHENT SPEQFICATION INCORPORATE # THE CONTRACT DOCUMENTS.
THE PROVISIONS.OF TRE SPEGFICATION ARE ‘TO BE STRICTLY ADHERED TO,
s
PRIOR TO THE COHMERCENENT OF CONSTRUCTION, THE CONTRACTOR iS TO PROVIDE
A OETAILED PROGRAH TO THE SUPERINTENDENT SHOWING THE TIMING FOR ALL
WORKS ASSCOATED, WITH THE PROJECT, NOMNATING, IN PARTICULAR, THE
PROGRAM FOR INSTALLATION OF SOL AND EROSION CONTROL SYSTEMS,
EARTHWORKS SHALL 8£ CARRIED OUT IN-SUCH A NAHNER THAT THE SITE IS
HAINFAREO:IN A WELL DRAINED. CONDITION, AREAS OF LOOSE SOIL ARE HINIHISED
AND CONCENTRATIONS OF STORM WATER ARE MINMISED.
+
}> THE GASIC OBJECTIVES OF THE EROSIOH ANO SEOMENT CONTROL ARE:
» IDENTIFY CRITICAL AREAS: ANO: PROVDE SPEGAL ATTENTION TO THOSE AREAS,
+ PLAN SITE LAYOUT SO THAT ACCESS YO ALL REGURED ORAINAGE EROSION AND.
SEDIMENT CONTROL MEASURES [S NARITAINED..
~ LOTT EXPOSURE TIME BY PROGRAMMING TO NINMISE. THE AREA OF LAKD
EXPOSED 70 POTENTIALLY ADVERSE WEATHER CONDITIOHS AT ANY ONE TINE.
= PROVIDE. CONTROL MEASURES INCLUEBNG TEHPORARY AND PERHAKENT DRAWAGE,
EROSION AND SEDMENT CONTROLS.
-
THE EROSION AHO SEQENT CONTROL SHALL COMPLY WITH LOCAL AUTHORITY.
EROSION AND SEDMENT CONTROL STANDAROS, THE SOX ERORON AND SEOMENT
CONTROL ~ EXGREERING GUDELBIES FOR QUEENSLAND [CURRENT EOITHOHS), AND.
ALL OTHER LOCAL AUTHORITY EROSION ANO SEDHERT CONTROL GUIDELINES,
& ALL ESC HEASURES SHALL BE AISPECTED,
‘ AT LEAST DAILY (WHEN WORK 1S OCCURRING Of SITEL;
+ WITH 25 HOURS OF EXPECTED RAIN; AND
= WITHH 18 HOURS OF RAINFALL EVENT fie, AN EVENT OF SUTFICENT INTENSITY
‘AND BURATION TO MOBILISE SEOMENT ON 'SITE), MAINTENANCE OF ESC HEASURES
SHALL CCCUR IN ACCORDANCE WITH THE FOLLOWING TABLE:
Esc : TRE FRAME FOR COMPLETION
MEASURES. MAIRTENANCE TRIGGER ‘OF MAUITENANCE
WHEN SETTLED SEDIMENT EXCEEDS:
SEDIMENT THE VOLUHE OF THE SEQMENT WITHIN: 7 DAYS CF
BASIS. STORAGE ZONE (SEE COUNCIL'S THE INSPECTION
SEDINENT BASN DESIGN GUIDELINES)
‘OTHER ESC THE CAPACITY OF ESC BY THE END
MEASURES: MEASURES FALLS BELOW 75% OF THE DAY
EROSION-AND SEDIMENT CONTROL NOTES
OPSOIL:
4, SEOMENT FENCES TO BE PLACED AS SHOWH, FOR OETARS OF SEDIMENT FENCE
REFER IPWEA STANDARD DRAWING B-2640,.
2. STRIP AND STOCKPILE AVAILABLE TOPSOIL [ASSUMEO AVERAGE DEPTH Itfunt
FROM ALL BISTURBEG AREAS PRIOR TO BULK EARTHWORKS.
3 GRADE EVENLY BETWEEN ALLOTHEAT FINISHED SURFACE LEVELS AND ENSURE
LOTS ARE FREE DRAINING.
4. PERIMUM SLOPE ACROSS ALLOTMENTS TO 8E 1%,
5S, ALL FOOTPATHS, BATTERS ARO EARTHWORKS AFFECTED ALLOTMENTS ARE TO
BE TOPSOLED TO A MIMUM DEPTH OF {tein FLIGHTLY COHPACTEOE AND.
TURFED WHERE SPECFIEO.
SEDIMENT FENCES:
1. SEQNENT FENCES 10 BE REPAREO AS REQUIRED AND EXCESSIVE SEOHENT
GEPOSITS ‘SHOULD BE REMOVED.
2, IM THE EVENT GF WET WEATHER, SNSTALL KERB INLET FILTERS WITH GRAVEL
RARGING FROM Sam TO:5na IN SIZE. REFER IPWEA STANDARD DRAWING
G-BEXT, WHEREVER PRACTICABLE SEOINENT RUNOFF SHOULD BE COLLECTED
ASD RETAINED WHOLLY WITHN THE WORKSITE OR PRIGR TO ENTRY ON A.
ROAD SURFACE {WHETHER INSIDE OR. OUTSIDE THE SITEL OF THE GRAVEL
FILTER BECOMES CLOGGED WITH SEDIMENT DURING ITS USE, THE GRAVEL MUST
BE PULLEO AWAY FROM THE HESH AND CLEARED OR REPLACEO.
3. DAILY CHECKS OF SILT FENCES 1S 70 8€ NADE ALONG WITH A CHECK AFIER
ANY SIGNIFICANT ‘STORM EVENT TO ENSURE INTEGRITY ARO PERFORMANCE.
TURFING: .
1. PROVIDE TURFING 70 ENTIRE WIDTH OF ALL SWALES, FOOTPATHS AMD 4 ft 4
CUT AND FLL BATTERS.
2, FOOTPATH BATTERS ARE TO BE STAGILISED WITH. TOPSOL {AND TURFED] AS
‘SOGH. AS PRACTICAL AFTER BATTERS HAVE BEEN COMPLETED. RENAINHG
EXPOSED AREAS ON LOTS ARE TO BE SEEDED AND MULCHED [eg.
RYDROMULCHED!,
3. ALL AREAS OF CUT AND. FILL INCLUDING ROAD VERGES: 10 BE SEEDEO 10
AGHEVE 85% STRIKE WITH TWO WEEKS AND 80% COVERAGE WITH SOX
ONONTHS,
‘A’ DURING CONSTRUCTION:
7, WATER QUALITY ‘SAMPLES HUST BE TAKEN AND ANALYSED PRIOR TO THE RELEASE
OF ANY WATER FROM THE SITE. WATER QUALITY HUST SATISFY THE FOLLOWING
CRITERIA: T$5<50 mg/t pH BETWEEN 6.5 AND 8.5. WATER QUAUTY FALS THE
CRITERIA THEN USE OFA GYPSUM FLOCCULENT 1S TO BE APPLIED AS DIRECTED BY
‘TRE SUPERMTENDENT,.
#, ALL WATER QUALITY DATA INCLUDING DATES OF RAINFALL, TESTING ANO WATER
RELEASE MUST BE HAINTAINED IN AN ONSITE REGISTER. THIS REGISTER IS TO: BE
‘HAINTABIEO FOR THE DURATION OF THE APPROVED WORKS ANO'BE AVABABLE ON
SITE FOR RISPECTIONS BY COUNCIL OFFICERS ON REQUEST.
9. CONSTRUCTION ACCESS SHALL BE AT ONLY ORE NORINATED PONT'AS DETAILED OF
THE PLANS, A TRUCK WASH HARD STANO AS DETAILEO ON THE PLAN COMPRISING
FREE DRANG GRAVEL SHALL BE LOCATEO ADJACENT TO THE POINT OF ACCESS:
WHERE VEHCLES CAN BE WASHED DOWN PRIOR FO EXIT TO THE STREET SYSTEM
AF REQURED, THE WASH DOWN AREA SHALL BE KEPT FREE OF HUO,
}» FOR DETAILS. OF ‘SHAKE OOWN. AREA REFER TO IPWEA STANDARD. DRAWING O-0048,
VL SUPPLEMENTARY EROSION AND SEOIMENT CONTROL DEVICES NAY BE REQUIRED AT
THE DISCRETION OF THE SUPERINTENDENT ANDZOR COUNCIL,
42. SEDIMENT CONTROL DEVICES SHALL BE PROVIDED WHERE SHOWN ON THE DRAWINGS,
SEDIMENT TRAPS SHALL REMAN Mi PLACE UNTIL AT LEAST 78%: SOIL COVERAGE
UPSTREAH AND COWNSTREAM OF THE OEVKE 1S ACHEYED AND/OR AS DIRECTED
‘BY COUNTE,
1B. EXCAVATED MATERIAL WiLL BE PLACED DIRECTLY INTO FILL AREAS IN ACCORDANCE
WITH THE APPROVED ‘SPECIFICATION,
4, ANY RPORTED FILL MATERIAL SHALL COMPLY WITH THE REQUIBENENTS OF THE
SPECIFICATION,
35. ALL TEMPORARY EROSION AND: SEDIMENT CONTROL (ESCE MEASURES TO BE
MAINTAINED AND FULLY OPERATIONAL DURING THE MAINTENANCE PERIOD AND. ARE
TO. REMOVED AFTER THE SATISFACTORY COMPLETION OF A OFF-MAINTENACE
INSPECTION BY COUNCE AND PRIOR TO FORMAL ACCEPTANCE “OFF MAINTENANCE”
BY COUNcE.
ORDER OF CONSTRUCTION
PRIOR TO ANY CONSTRUCTION COMMENCING,
CONSTRUCTION ENTRY/ EXIT: TOBE INSTALLED.
SITE BARRIER/NO-G0 FENCRG TO BE ESTABLISHED.
‘SEOMENT FENCES AND TRAPS {WLET PROTECTION}
TO BE INSTALLED.
‘SITE TO 8E SHAPED TO DESIGN LEVELS ANO
‘SURFACE STABAIZEO ASAP BY HEANS OF TOP
SOLING AND GRASS SEEQNG WHERE APPLICABLE,
1. TOPSOL STOCKPILE 10 HAVE A SEDIMENT FENCE DOWN SLOPE AND &
DIVERSION DRAIN UP SLOPE,
2 SEOMENT FENCES TOBE PLACED AS SHOWN,
3. INSPECT BANKS DALY ANU REPAIR ANY SLUMPS, WHEEL TRACK QANAGE OR
LOSS OF FREEBOARD,
4. REHOVE SEDIMENT TO AVOID PONDING FROM CATCH DRAINS,
5, REMOVE EXCESSIVE SEDHENT FROM UPSTREAH OF CHECK DAM.
"ROAD RESERVE TO BE.USEU'AS, HAUL, ROAD,
7. A CATCH ORAIN/CATCH BANK IS TO BE PROVIDED ON THE TOP SIDE OF “ALL
CUTS ANO DISCHARGE EITHER TQ UNDISTURBED GRASS LANGS CR TO THE
CROSS ROAD. DRAINAGE,
@, SUPPLEMENTARY EROSION AND SEDIMENT CONTROL DEVICES MAY BE REQUIRED
AT THE DISCRETION OF THE EXGNEER,
% GRASS SEEDNG IS TO ACHEVE 70% COVER WITHN 3t DAYS OF COMPLETION
‘OF EARTHWORKS,
(BL FOLLOWING CONSTRUCTION: ,
4,” SEDIMENTATION AND EROSION CONTROLS TO BE MAINTAINED UNTIL. SITE IS 60%
STABAISED WITH ESTABLISHED GRASS/TURP THEN CONTROLS CAN BE
(OVED.
HOLD POINT
Ty WORK TO ROADS, ORAIAGE, SEWER, WATER OR EARTHWORKS HUST NOT
PROCECO UNTIL ADEQUATE SEDIMENT CONTROL IS RE PLACE TO THE
SATISFACTION OF THE SUPERRITENOENT.
WARNING
THE LOCATION OF ALL EXISTING SERVICES (E.G, TELSTRA,
ELECTRICITY, SEWERAGE, WATER & GAS) ARE SHOWN
SCHEMATICALLY ON THE DRAWINGS. PRIOR TO AND
DURING CONSTRUCTION OBTAIN YHE PRECISE LOCATION OF
ALL SERVICES (UNDERGROUND: & OVERHEAD} FROM THE
RELEVANT AUTHORITY RESPONSIBLE FOR THE SERVICE
SHOWN, THE CONTRACTOR SHALL BE RESPONSISLE FOR
ANY DAMAGE TO EXISTING SERVICES WHETHER SHOWN
ON THE DRAWINGS OR NOT,
DORIS OUT
SEEKER
STABILISEO.
Lee SURFACE
mA
SEOMENT FENCE
Sy
7 ~
TYPICAL STOCK PILE DETAILS
NOT TO SCALE oe
STOCK PILE NOTES:
ra
3.
4
&
PLACE STOCKPILES NORE THAN 2 (PREFERABLY 5} METRES FROM EXISTING VEGETATION, CONCENTRATED:
WATER FLOW, ROADS AND HAZARO AREAS,
CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS,
WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS THAR 2 METRES IN HEIGHT.
WHERE THEY ARE YO BE IN PLACE FOR MORE THAN 10 DAYS, STABILISE FOLLOWING THE APPROVED
ESCP OR SWMP TO REDUCE THE C-FACTOR TO LESS THAN 0.10,
CONSTRUCT EARTH BANKS {STANDARD DRAWING 5-5} ON THE UPSLOPE SIDE TO OIVERT WATER
AROUND STOCKPILES AND SEDIMENT. FENCES. (STANDARD. DRAWING 6-8} 1 70 2 METRES DOWNSLOPE.
KERB SEDIMENT TRAP DETAIL
HOT TO SCALE
FABRIC, -BIOIM
U3$ OR SIMILAR
GG ~ 75ma. CRUSHED ROCK
TEMPORARY CONSTRUCTION
ENTRY / EXIT SEDIMENT TRAP
ROLL OF NETTING FILLED WiTH
Sdom TO 75em GRAVEL:
ROLL OF RETTING FILLED
> WITH 50 TQ 75mm GRAVEL
NOT TO SCALE
FG2 FABRIC
TO AS 1394
FIX TQ TOP OF STAKE WITH
SHADECLOTH FASTENER OR
VE TO STEEL PICKET.
300 MIN, HIGH BERM GEQTEXTILE FABRIC
. AD Fle
2
SOXS9 HW STAKE OR STEEL
PICKET 1266 HIN LONG
CRUSHED/GRANHULAR
MATERIAL; GRADING TO
TABLE & OF OT
SPECIFICATION MRS11-03,
SEDIMENT FENCE DETAIL
NOT TO SCALE
DISTURBED AREA
GULLY INLET PROTECTION DETAIL
we “POSES OR STEEL PICKETS
DRIVEN 600mm INTO
GROUND rr
80 MIN VERTICAL
OVERLAP OF FABRIC
GACKFILL UNDISTURBED AREA
SEDIMENT FENCE ELEVATION
NOT TO SCALE
stares
FOR APPROVAL
‘HOWES ’ (Ctisnts’ GEOR & REGNA ACTON Designed: SMO [deawi Chesked TOP) [lities ‘Gate: MARCH 2615 [Scate. AS SHOWN
Tis i Sha progerie sf the engieter ad may te) be BUNDABERG GLADSTONE SUNSHINE COAST - °
moet teeet Sales! BNA PARE seccone, ouescney,, geemmgaar "| [ret proroseo DnvewaY ACCESS teres EE SEDIMENT & EROSION CONTROL 2b Ref Rox [avg Hs "tsb
sgrans paretsticn of the engeaet, tegen Wibea St Senlery GLAD PBT Chalenee EO BAS “TIDE Madden BENT 5 2
9 Beieg) neers fie aan ENGINEERING bauer” Parente Pesta No.9 WEYBA ESPLANADE NOTES & DETAILS SC-5054 C03 A
Date [ort ) \S ei crenene on sev grins RS 7 = Roosa L TROY PAULSEN / RPEQ: 6990 - /
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW15/0035 Operational Works application for driveway relocationRelated documentApplication case desk ↗
About this file
- File size
- 12.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.