Council archive · source document
Attachment D Construction Manangement Plan · 132003.221152.5
Attached to the e-mail 132003.221152.5 - Response to further information - Part 2.
Plans and drawings: the text below has words only, no drawings.
present to divert vehicles during the installation of screw piles and
excavation of footings.
Traffic controllers will divert all vehicle deliveries and departures to the site
on Park Road. The timing of deliveries shall be such that they do not
coincide with peak usage times in Park Road.
Refer to “Traffic Guidance Scheme No.129164” prepared by Evolution
Traffic Control for details of proposed traffic management.
1.11
In conclusion, we believe that if the procedures nominated above are
adopted, the elevated terrace can be safely constructed with minimal impact
on surrounding property.
STEFAN PRYSTUPA, B.Eng (Civil); M.I.E.Aust; C.P.Eng; RPEQ
July 2016
JOB NO. 16503
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D Construction Manangement Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 871 KB (small file)
- File type
No other editions are linked here.