Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2014-01-02 Budget Adoption Report Attachments

of 161

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

DEPARTMENT                                  COMMUNITY INFRASTRUCTURE
Corporate Program                           Civil Operations

Program objectives
   To provide an efficient and effective internal construction capability for Council
   To enhance the environment, amenity, accessibility and appearance of Noosa by ensuring effective renewal, replacement and
    maintenance programs are in place for community infrastructure assets
   To provide an effective response capability for essential community infrastructure during natural disasters
                                                                                                    Service delivery        Responsible
Service                   Key Activities                          Service levels
                                                                                                                            Manager
Works Operations
Roads, Bridges and           Construction (day labour)           Interim retain existing service   Internal and Contract   Manager Civil
Pathways, Car parks          Infrastructure construction and     levels until otherwise reviewed                           Operations
                              maintenance                         by council
                             Contract management
                             Roadside vegetation management
                             Street sweeping
                             Street lighting
                             Quarry operation
                             Emergency operations

Canals and Waterways         Infrastructure construction and     Interim retain existing service   Internal and Contract   Manager Civil
                              maintenance                         levels until otherwise reviewed                           Operations
                             Noosa Waters security access        by council
                              system
                             Management of State owned boat
                              ramps & jetties

Beaches                      Maintain coastal protection works   Interim retain existing service                           Manager Civil
                             Noosa Beach sand replenishment      levels until otherwise reviewed                           Operations
                             Beach Cleaning                      by council
                             Beach access construction and
                              maintenance




                                                                                      Noosa Council | Operational Plan 1 Jan 2014 to 30 June 2014   22
Log in to download the original file

2014-01-02 Budget Adoption Report Attachments(PDF, 2MB).pdf · 2.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.