Council archive · source document
08/0056 - Operational Works - Landscaping (Road Reserve) [As Published] · 142008.56
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
4.11
Nein of the operational work proposed to be carried out within a coastal management district?
No Yes
If yes, is the proposed operational work for the following?
¢ Interfering with quarry material on State coastal tand above high-water mark (No (1) Yes
¢ Disposing of dredge spoil or other solid waste material in tidal water (No (Yes
« — Oraining or allowing drainage or flow water or other matter across State costal land above high- {No (Yes
water mark
¢ — Constructing or installing works in a watercourse where the works are not assessable under IPA, (Ono Yes
schedule 8, part t, table 4, items 3 or 4
¢ Reclaiming land under tidal watera OONo (Yes
* — Constructing an artificial waterway, other than acanal, associated with reconfiguring a lot Ono (Yes
* — Constructing an artificial waterway that is a canal, associated with reconfiguring a lota Ono (Yes
¢ — Constructing an artificial waterway not associated with reconfiguring a fot on land, other than State {No (1Yes
coastal land, above high-water if the maximum surface area of water on the waterway is at least
5,000m2
¢ — Constructing a bank or bund wail to establish a ponded pasture on land, other than State coastal CiNo [Yes
land, above high-water mark
¢ Removing or interfering with coastal dunes on tand, other than State coastal land, that is in an Ono (Yes
erosion prone area and above high-water mark
If yes to one or more, is any of the proposed work to be carried out in a wild river area under the Wild Rivers Act 2005?
oO No - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is.nat the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency, If yes, above, to any shown-bold and marked
with the symbol 9, the application also requires assessment by Queensiand Transport (Marine Salety Qk) as Concurrence Agency.
Yes
If yes, is alt of the proposed operational work for specified works under the Wild Rivers Act 2005?
Yes - Unless the application is consistent with any property development plan applying to the fand, the Assessment Manager must refuse to
receive it (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not
the Assessment Manager for the application, the agency has jurisdiction as concurrence Agency. If yas, above, to any shawn bold and
marked wilh the symbol 8, the application also requires assessment by Queensland Transport (Marine Safety Qk) as Concurrence
Agency. Subject to the declaration for the relevant wild river area, the application also requires assessment for the purposes of the Wild
Rivers Act 2005,
oO No - An application for the operational work would be taken to-be not properly made and the Assessment Manager must refuse to receive it.
IPA schedule 8, part 1 lable 4 lam § IP Regulation schedule 2 tabie 2. tems 12 and 4 (P Reguiation schedule 1 oart 3 table 4. tems 44 and 5 Coastal Protection and Management
Act 1995 Act 1995, section 1044 (wil! aver araay, Wid Rivers Act 2005 section 134.
Page 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0056 - Operational Works - Landscaping (Road Reserve) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.