Council archive · source document
08/0056 - Operational Works - Landscaping (Road Reserve) [As Published] · 142008.56
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
WATERWAY BARRIER WORKS; WILD RIVER AREA
4.12 4s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No C1 Yes
If yes, is any of the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
(No
If no, is all of the operational work for constructing or raising waterway barrier works -
¢ _ intended to exist for no more than 28 days; and
© built or raised in freshwater; and
® no more than 20m in fength and no more than 3m in height from the lowest point on the stream bed?
0 Yes CINo
If no, is alt of the operational work for constructing or raising waterway barrier works -
© more than 100km from the coastline; and
inthe smallest unbranched tributary of a catchment or a stream into which that tributary flows
oO Yes oO No - (Complete Form 1, Part O,) This application requires assessment by the Department of Primary Industries and
Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
Yes
If yes, is any of the proposed operational work to be carried out in a wild river high preservation area?
) No - Uniess the application is consistent with any property development pian applying to the land, the Assessment Manager must refuse to receive
it (Complete Form 1, Part Os} This application requires assessment by the Department of Primary industries. and Fisheries (DP1&F}. and,
‘Subject lo the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2008. if DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
O Yes - An application for the operational work would be taken to be not properly made and the Assessment Manager must refuse to receive it,
'PA, schedule 2, part 1. tabie 4 2m 6, IPA schedule 3 pad 2 labe 4 tem 2 iP Regulabon schedule 2 table 2 tem 28 iP Regulation. schedule t part J table 4. tem 6 Fishares Act
1994, section 76D {wild nver area), Wid Rivers Act 2005 section 43A
DECLARED FISH HABITAT AREA; WILD RIVER AREA
4.13 | ls any of the proposed operational work to be carried out completely or partly within a declared fish habitat area under the Fisheries
Act 1994.
pee 0 Yes
yes, indicate what the operational work is reasonable necessary for (Tick applicable box/es)
* — The maintenance of existing structures, including for example the following structures, if the structures [_]No [} Yes
were constructed in compliance with all the requirements, under any Act, relating to a structure of that
type -
« Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures & weirs;
+ Existing powerlines or associated powerline infrastructure
« — Educationat or research purposes relating to the fish habitat area EINo £) Yes
* Monitoring the impact of development on the declared fish habitat area (No (1 Yes
¢ — Other purposes [No (Yes
If yes to Other purposes’, is that proposed operational work to be carried out in a wild river area declared under the Wik
Rivers Act 2005?
oO No - (Compiete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries (DPI8F). If DPI&F is nokthe
Assessment Manager for the appication, the agency will have jurisdiction as Concurrence Agency.
U1 Yes
If yes, is alt of the proposed operational work for specified works under the Wild Rivers Act 2005?
Y@S - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive
it (Complete Form 1, Part 02) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F) and
assessment for the purposes of the Wild Rivers Act 2005. !f DPI&F is not the Assessment Manager for the application, the agency has
jusisdiction as Concurrence Agency.
(No
If no, is any of the proposed operational work to be carried out in a wild river high preservation area?
oO No - Uniess the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1. Part O2) This application requires assessment by the Department of Primary Industries and Fisheries
(DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if DPI&F
Js not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO Y@S - An application for the operational work would be taken to be not properly made and the assessment manager must refuse to receive
the application.
iA schedule 8 part | table 4 dem 7. IPA schedule 3 par 2 tine + sem 3 iP Regulation, senecul2 2 tanie 2 item 23. /P Reguiavon scheduie | part} tanad aem 7 Wild Rivers Act
20035 sections 424, Fisheries Act sechon 760C ; wid nver 237
Page 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0056 - Operational Works - Landscaping (Road Reserve) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.