Council archive · source document
08/0056 - Operational Works - Landscaping (Road Reserve) [As Published] · 142008.56
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA
4.14
Is gny of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
Ba No Yes
If yes, indicate what the proposed operational work is reasonably necessary for (Tick applicable box/es)
» The removal, destruction or damage of dead marine wood on unallocated State land, other than [JNo (1 Yes
in a wild river area, for trade or commerce
« — The maintenance of existing structures, including, for example, the following structures, if the [Ino (Yes
structures were constructed in compliance with all the requirements, under any Act, relating to a
structure of that type —
« — boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures
and weirs;
° — existing drainage structures;
« — existing powerlines or associated powerline infrastructure
¢ For educational or research purposes or for the monitoring the impact of development on marine no DYes
plants
« — Other purposes (ino ClvYes
Ht yes to Other purposes’, is that proposed operational work to be carried out in a wild river area declared under the Wild
River Act 2005?
oO No- (Complete Form 1, Part Oz) This appication requires assessment by the Department of Primary Industries and Fisheries (DPI&F). HOPIBF is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
0 Yes
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 20057
Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must
refuse to receive it, (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries
and Fisheries (OPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild
Rivers Act 2005. If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
CNo
If no, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or
infrastructure required to support other development for which a development permit is not required or, if a
development permit is required, the permit is held or has been applied for?
oO Y@S - Unless the application is consistent with any property development pian applying to the land, the Assessment Manager must
refuse to receive it. (Complete For 1, Part Ox) This application requires assessment by the Department af Primary Industries
and Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area. assessment for he purposes of the Wild
Rivers Act 2005. f DPI&F is not the Assessment Manager for the application, the agency has. jurisdiction as Concurrence
Agency.
oO No - An application for the operational work would be taken to be not properly made and the Assessment Manager must refuse to
receive it.
IPA schedule 8 part { table 4, tem 8. ‘PA schedule 8 part 2 tabie 4 tem + -P Regulation schedule 2 table 2 vam 29, IP Regulation schedule ! part 3 ‘able ¢ .'em 8 Fishaues Act
1994, section 7608 (wid river area). Wild Rivers Act 2005, section 434.
Page 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0056 - Operational Works - Landscaping (Road Reserve) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.