Council archive · source document
09/0917 - Op Works - 2nd Driveway [As Published] · 142009.917
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 22
WILD RIVER AREA
4.15
Is ahy of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No-Gowat16 §=[JYes
If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
assessable?
(i) Agricultural activities as defined under the Wild Rivers Act 2005 LI No LJ Yes
(ii) Animal husbandry activities as defined under the Wild Rivers Act 2005 (1 No (J Yes
if yes to either {i) or (ii) above, is any part of the premises in the wild river high preservation area?
Yes - An application for the operational work will be taken to be not property made and the Assessment Manager must refuse to receive it.
(No
If no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
O Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it,
O No - Unies the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it (Complete Form 1, Part Q if agriculture. Complete Form 1, Part R if animal husbandry) Subject to the declaration for the
selevant wild river area, this application requires assessment by the Department of Natural Resources and Water (NRW). if NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
1A, schedule 8, part 1. table 4, tent 10 iF Reguidtion, schedule 2, table 2, tem 37, Wild Revers Act 2005, sections 42, 434.
STATE-CONTROLLED ROAD sx. apne cee ps ce ny gt
4.16 |\s any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No -Endofsections ([] Yes
If yes, is the proposed operational work associated with either -
+ Amaterial change of use that is assessable under the planning scheme; or
Line (Yes
Reconfiguring a lot that increases the total number of lots, or increases the total number of lots
abutting the State-controlied road
If no, and answers to questions in this section of the checklist indicate the proposed operational work is assessable under
IPA, schedule @ - Answer (a) - (c) betow.
(a} Is any of the proposed operational work associated with access to a State-controlled road?
Oo No oO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(b) Is any of the proposed operational work for filling or excavation?
[No O Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
Oo No - This application must be relerred to the Department of Main Roads (OMR} as Concurrence Agency.
oO Yes - This application must be referred to the DMR as Advice Agency.
Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controfled road?
LINo
Yes
Hf yes, is the operational work proposed in a future State-controlled road not defined by route?
Oo)
No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
LU Yes - this application must be referred to the DMR as Advice Agency.
eZ, tent 3
JP Regutateit, schedide 2. 13}
Page 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0917 - Op Works - 2nd Driveway [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.