Skip to the record
Beware of cheap imitations.

Council archive · source document

09/0917 - Op Works - 2nd Driveway [As Published] · 142009.917

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

BUILDER TO VERIFY ALL DIMENSIONS & LEVELS
ON SITE PRIOR TO ORDERING OF MATERIALS &
COMMENCMENT OF CONSTRUCTION

BUILDER TO COMFIRM LOCATION OF SEWER LINE
BEFORE COMMENCMENT OF CONSTRUCTION

 

 

 

 

 

NOTE:

DEVELOPMENT MUST BE UNDERTAKEN

AND OPERATED IN A MANNER THAT CAUSES
NO DETRIMENTAL EFFECT UPON THE AMENITY
OF THE NEIGHBOURHOOD BY REASON OF THE
CREATION OF THE EXESSIVE NOISE,LIGHTING
NUISANCE OR OTHER EMISSIONS.

 

BOUNDARY LINE

} 11364

 

 

 

 

PROPOSED EXCATION 100MM DEEP
BEDDING LAID, 72MM SLAB W/STEEL

 

~——_—
|
]
|
l
|
—_-—H4

| NEW |
| CONSTRUCTION
| LEVELONE |

 

 

 

 

GROUND FLOOR __ |

 

 

 

1500

 

 

 

 

 

carport roof line

 

 

 

 

 

 

Stormwater drainage
to be diverted to kerb and

channel via 90 mm PVC
underground lines Trees.

Sewer Main

— Distance to the road

' SU
Site NSET Drive
1: 200
NOTES
RUCTIO
RP DETAILS REQUIREMENTS & RELEVANT AUSTRALIAN STANDARDS. NG COPE
LOT: 4

DIMENSIONS TAKE PREFERENCE OVER SCALE. DO NOT SCALE OFF

R.P. No: 128795 DRAWINGS.

PARISH: WEYBA

COUNTY: MARCH

AREA: 577 m2?

LOCAL AUTHORITY: NOOSA

ENSURE THE GROUND LEVEL FALLS AWAY FROM THE BUILDING LINE
FOR 1000mm PERIMETER OF THE BUILDING, WITH MIN FALL 1:10 TO
ALTERNATIVELY ENSURE ADEQUITE DRAINAGE MAX 1:1

      

   
 

   

  
  

Sear a era

REFER TO LOCAL AUTHORITYS BROCHURE TITLED "EROSION AND SEDIMENT CONTROL
ON RESIDENTIAL BUILDING SITES”. ALSO REFER TO LOCAL AUTHORITIES “BEST
PRACTICE GUIDELINES FOR THE CONTROL OF STORM WATER POLLUTION

FROM BUILDING SITES.”

REFERE TO CONSULTING ENGINEERS DRAWINGS FOR SLAB & FOOTING DETAILS &
SOIL REPORT.
i

BUILDER MUST CHECK ALL BOUNDARY LINES & PEGS BEFORE COMMENCEMENT OF ANY
BUILDING WORK. SHOULD SITE CONDITIONS DIFFER FROM THOSE INDICATED SEEK
INSTRUCTIONS FROM DESIGNER.

NOTE

They should not be encluded in tender documents.

Ne aS

ieee

 

 

 

Oop E>

E | wdg-amended

F  |wdg-amended

preliminary dwg SP
preliminary dwg ySP
working dwg JSP
working dwg JSP
wdg-revision USP
-carport roof line
-window schedule
-electrical plan

D. | wdg-revision JSP

-removing existing
wall and pantry

-adding the I'dry on the
existing deck

setback, stormwater USP
drainage

demolition, floor, level JSP
electrical plans

confirming structure of
existing door that need
to be replaced

F |FINAL CONSTRUCTION

DWG

 

 

Hs

A,

23.03.09,
24.03.09,
25.03.09,
30.03.09,
01.04.09,

06.04.09.

14.05.09,

19,05.09,

25.05.09,

29.05.09,

 

 

 

 

PROJECT
FRANCIS RESIDENCE

CUENT

CRAIG FRANCIS
LOCATION

1 PAUL STREET NOOSA

TITLE

01-SITE PLAN

Coa

 

All loose furniture shown on the floor plans are indicative only.

 

 

 

 

 

 

Se eee ere

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0917 - Op Works - 2nd Driveway [As Published].pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.