09/0917 - Op Works - 2nd Driveway [As Published] · 142009.917
BUILDER TO VERIFY ALL DIMENSIONS & LEVELS
ON SITE PRIOR TO ORDERING OF MATERIALS &
COMMENCMENT OF CONSTRUCTION
BUILDER TO COMFIRM LOCATION OF SEWER LINE
BEFORE COMMENCMENT OF CONSTRUCTION
NOTE:
DEVELOPMENT MUST BE UNDERTAKEN
AND OPERATED IN A MANNER THAT CAUSES
NO DETRIMENTAL EFFECT UPON THE AMENITY
OF THE NEIGHBOURHOOD BY REASON OF THE
CREATION OF THE EXESSIVE NOISE,LIGHTING
NUISANCE OR OTHER EMISSIONS.
BOUNDARY LINE
} 11364
PROPOSED EXCATION 100MM DEEP
BEDDING LAID, 72MM SLAB W/STEEL
~——_—
|
]
|
l
|
—_-—H4
| NEW |
| CONSTRUCTION
| LEVELONE |
GROUND FLOOR __ |
1500
carport roof line
Stormwater drainage
to be diverted to kerb and
channel via 90 mm PVC
underground lines Trees.
Sewer Main
— Distance to the road
' SU
Site NSET Drive
1: 200
NOTES
RUCTIO
RP DETAILS REQUIREMENTS & RELEVANT AUSTRALIAN STANDARDS. NG COPE
LOT: 4
DIMENSIONS TAKE PREFERENCE OVER SCALE. DO NOT SCALE OFF
R.P. No: 128795 DRAWINGS.
PARISH: WEYBA
COUNTY: MARCH
AREA: 577 m2?
LOCAL AUTHORITY: NOOSA
ENSURE THE GROUND LEVEL FALLS AWAY FROM THE BUILDING LINE
FOR 1000mm PERIMETER OF THE BUILDING, WITH MIN FALL 1:10 TO
ALTERNATIVELY ENSURE ADEQUITE DRAINAGE MAX 1:1
Sear a era
REFER TO LOCAL AUTHORITYS BROCHURE TITLED "EROSION AND SEDIMENT CONTROL
ON RESIDENTIAL BUILDING SITES”. ALSO REFER TO LOCAL AUTHORITIES “BEST
PRACTICE GUIDELINES FOR THE CONTROL OF STORM WATER POLLUTION
FROM BUILDING SITES.”
REFERE TO CONSULTING ENGINEERS DRAWINGS FOR SLAB & FOOTING DETAILS &
SOIL REPORT.
i
BUILDER MUST CHECK ALL BOUNDARY LINES & PEGS BEFORE COMMENCEMENT OF ANY
BUILDING WORK. SHOULD SITE CONDITIONS DIFFER FROM THOSE INDICATED SEEK
INSTRUCTIONS FROM DESIGNER.
NOTE
They should not be encluded in tender documents.
Ne aS
ieee
Oop E>
E | wdg-amended
F |wdg-amended
preliminary dwg SP
preliminary dwg ySP
working dwg JSP
working dwg JSP
wdg-revision USP
-carport roof line
-window schedule
-electrical plan
D. | wdg-revision JSP
-removing existing
wall and pantry
-adding the I'dry on the
existing deck
setback, stormwater USP
drainage
demolition, floor, level JSP
electrical plans
confirming structure of
existing door that need
to be replaced
F |FINAL CONSTRUCTION
DWG
Hs
A,
23.03.09,
24.03.09,
25.03.09,
30.03.09,
01.04.09,
06.04.09.
14.05.09,
19,05.09,
25.05.09,
29.05.09,
PROJECT
FRANCIS RESIDENCE
CUENT
CRAIG FRANCIS
LOCATION
1 PAUL STREET NOOSA
TITLE
01-SITE PLAN
Coa
All loose furniture shown on the floor plans are indicative only.
Se eee ere
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0917 - Op Works - 2nd Driveway [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.