Original source · versioned page text
NSC Plumbing permit
am lefe| NOOSA COUNCIL Department: Building & Plumbing Services Direct Telephone: 5329 6480 Email: [email protected] Application Number: PL19/0350 22 October 2019 BK Bedford 4 Marblewood Ct COOROY QLD 4563 Dear Sir/Madam, Information Notice Permit Issued with Conditions Plumbing and Drainage Regulation 2019 s. 50 A: PROPERTY DETAILS Application No: PL19/0350 Street address: 5 Figbird Ct LAKE MACDONALD QLD 4563 Real property description: Lot 3 SP 266744 2: APPLICATION DETAILS Dwelling & Shed - 22 Fixtures - Earthsafe D10 3. ASSESSED DOCUMENTS/PLANS The following plans and documents were assessed: e Form 1 (Permit Work Application for Plumbing & Drainage) Dated 9/10/2019. e Site Assessment and Soil Test for On-site Effluent Disposal — 1 Design Waste Water Solutions — Ref No Figbird/5/2019 — Dated 26/9/2019. e Design Engineers Queensland - Articulation Report — Job No 19.2841 Dated 12/8/2019. e Ausmar Homes Design - Floor Plan & Shed — Dated 10/10/2019. 4. CONDITIONS OF DECISION Your application for a permit to carry out permit work (that is plumbing and drainage work) under Subdivision 3 of the Plumbing and Drainage Regulation 2019 was decided on 22 October 2019 by Council. Note: Please provide a copy of this permit to the responsible licensed plumbing and drainage contractor. The permit is issued subject to the following conditions: NOOSA COUNCIL PO Box 141 P. (07) 5329 6500 [email protected] ABN: 97 969 214 121 TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qid.gov.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 5 pages
Page 2
Development Conditions Compliance must be achieved with all other Development Conditions applicable to the premise relating to plumbing and drainage. i.e. conditions relating to a Material Change of Use or Reconfiguration of a Lot. (Reason: Conditions nominated on a Compliance Certificate for Plumbing and Drainage are subservient to all other related Development Conditions.) New On Site Sewerage Facility - Installation The on-site sewerage facility consisting of the Earthsafe D10 — Model SCHHD10 CEA 03/2019 and 240m? of Fixed Surface Irrigation Wobbler type Sprinklers with a 120 micron filter installed within the delivery line to the tank as per assessed report by | Design Waste Water Solutions are to be installed in their entirety before utilised for the intended purpose. Flexible connections shall be provided at connection points to all septic tanks and treatment plants. Trade waste apparatus, septic systems, holding tanks, regulated pumpouts and/or grease traps must be serviced and pumped out as required or at least every five (5) years, with condition report results to be submitted to the Plumbing Services Branch:of Noosa Council. (Reason: The effective operation of an on-site sewerage facility is reliant on the complete and proper installation of the facility prior to use in accordance with manufacturer recommendations and the associated design criteria.) Stages for inspection of permit work that is on-site sewerage work Section 65 of the Plumbing and Drainage Regulation 2019 requires that the local government must inspect plumbing work that is permit work before the work is covered. This condition requires each of the following stages of permit work be inspected. (a) For a trench or sub-surface irrigation- (i) Before filling with backfill; or (ii) After substantially filling with backfill but leaving a cross-sectional area of the trench or sub-surface irrigation not backfilled; (b) After all pipes for the relevant on-site sewerage facility are connected, and effluent resulting from sewage generated on the premises can be treated by the on-site sewage treatment plant; (c) If the relevant compliance permit imposes a condition requiring an assessment at 1 or more other stages of the work-each stage stated in the condition. Stages for inspection of permit work. Section 65 of the Plumbing and Drainage Regulation 2018 requires that the local government must inspect plumbing and drainage work that is permit work before the work is covered. This condition requires each of the following stages of Permit Work to be inspected. (1) Plumbing and Drainage Regulation requires each of the following stages of compliance assessable work be assessed before being covered. - (a) For plumbing or drainage laid under a floor slab or in another area where pipes or fittings will bé covered-before the floor slab is laid or the pipes or fittings are covered; (b) For plumbing or drainage that is laid below ground level and external to a building or other structure-before the backfill is placed;
Page 3
(if the soil classification for the site is H,E or P - a design showing the articulation of the sanitary drainage must be on site at the time of the inspection). (c) For plumbing installed in a building or other structure-before the cladding or lining covering the plumbing is fixed; (d) When the plumbing or drainage work, the subject of the request for compliance assessment, is completed; (2) The responsible person for the work must- (a) Request an assessment of the work at each of the applicable stages mentioned in subsection (1); and (b) For the stage mentioned subsection (1) (d)-make the request within 5 days after the work is completed; and (c) Before or when the work is assessed, give the local government details in the approved form (Form 7) of the responsible person. (3) The responsible person may request an assessment of the work only if the information or documents have been provided to the local government. (4) For the purposes of this section, compliance assessable work is completed when the work becomes operational. Approved Plans to be On-site The Responsible Person is to ensure that an up to date copy of Noosa Council approved plans are on-site when requesting an inspection of Plumbing and Drainage works. Approved plans must be available to the Plumbing Inspector for perusal of Permit Works for the site. (if the soil classification for the site is H,E or P - a design plan showing the articulation of the sanitary drainage must be on site at the time of the inspection). As-Constructed drawings to be lodged with Council The Applicant/Responsible person must supply in the approved form a As-constructed plan for the sanitary drainage and below ground water supply, to Noosa Council Plumbing Services. As-Constructed drawings must be lodged with Noosa Council Plumbing Services within 5 business days after the inspection/s of the service are complete. Drawings must contain comprehensive detail of the works undertaken and be of a professional standard in the approved form, (these may be hard copy format or electronic format). 5. REASONS FOR THE DECISION To ensure all plumbing work is carried out as per the Plumbing and Drainage Regulation 2019. 6. RELEVANT PERIOD OF APPROVAL This Plumbing Compliance Permit has effect for a period of two (2) years from the decision date 22 October 2019 and will therefore lapse 21 October 2021.
Page 4
Should the work commence, the responsible person must ensure that all mandatory inspections are undertaken by Council before 21 October 2021. This permit continues to have effect and attaches to the land and binds the owner; the owner’s successors in title and the occupier of the land. ts RESPONSIBLE PERSON The responsible person for regulated work is a person licensed for the work and who performs, directs the performance of, or supervises the work. The responsible person must ensure the work performed complies with the Plumbing and Drainage Regulation 2019. The responsible person must submit their details to Council on the approved Form 7 (Notification of Responsible Person). Inspections must be booked by a licensed person (Plumber/Drainer), please quote application number PL19/0350 when booking inspections. Inspections may be booked by calling: (07) 5329 6480. 8. APPEALS AGAINST THIS DECISION If you are dissatisfied with the decision of the Local Government to impose the above conditions on the permit, you are entitled to appeal to Development Tribunals (the Tribunals) in accordance with section 229 of the Planning Act 2016. An appeal against this notice must be lodged within 20 business days after the day the notice is given. If your appeal is not lodged within this timeframe, no further action can be taken by the Tribunals in relation to Local Government's decision. You can lodge an Appeal Notice by submitting a form 10 —- application for appeal/declaration and providing the prescribed fee to the Registrar of the Tribunals as follows: Post to: Department of Housing and Public Works The Registrar Development Tribunals Building Legislation and Policy PO Box 15009 City East QLD 4002 Australia Or email to: [email protected] For further information about the Tribunal, including the Appeal Notice (Form 10) and the schedule of fees, visit the Department’s website at www.hpw.qid.gov.au or contact the Registrar on 1800 804 833 or Fax: (07) 3237 1248.
Page 5
For enquiries in relation to this Information Notice please contact Building and Plumbing Services on 5329 6480. Yours faithf, Brett\Vairbanks PLUMBING INSPECTOR
Page 6
Srm 17—Permit for plumbing, drainage and on-site sewerage work GENERAL NOTES: This form is to be used for the purposes of sections 48(a) and 54(a) of the Plumbing and Drainage Regulation 2019 (PDR). 1. Description of land The description must identify all land the subject of the application. The lot and plan details (e.g. SP/RP) are shown on title documents or a rates notice. Street address (include number, street, suburb/locality and postcode) [ 5 Figbird Ct LAKE MACDONALD QLD 4563 Lot and plan | Lot 3 SP 266744 | Local government Shop/tenancy number Storey/level area ] | Noosa ] (if applicable) (if applicable) 2. Owner details Owners Name and Postal Address BK Bedford & JA Bedford 4 Marblewood Ct COOROY QLD 4563 3. Applicant details The applicant need not be the owner of the land. Applicant Name and Address BK Bedford 4 Marblewood Ct COOROY QLD 4563 Note: If lodging this application, the applicant is responsible for ensuring the information provided is correct and that they are authorised to manage the application on the owner’s behalf. 4. Certification This form certifies that the relevant local government or public-sector entity has made the following decision in relation to the application for a permit as described above. Tick the relevant boxes: Application refused Permit approved Permit approved - with conditions Permit approved - to amend an existing permit Permit approved — to extend the term of an existing permit O OWOO PL19/0350 22 October 2019 Permit number Date of issue Date of expiry 21 October 2021 Issued by Noosa Council 5. Attachments Local government or public sector entity may attach additional documentation to this form. Conditions of permit Approved plans and specifications Details of any alternative/performance solution XOORk Information notice Provide further comments (if applicable) Refer attached Permit with conditions and approved plans. The Plumbing and Drainage Act 2018 is administered by the Department of Housing and Public Works Queensland Government NOOSA COUNCIL ABN: 97 969 214 121 PO Box 1414 TEWANTIN QLD 4565 P. (07) 5329 6500 F. (07) 5329 6501 [email protected] www.noosa.qid.gov.au