Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

NSC Plumbing permit

of 6

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Development Conditions

Compliance must be achieved with all other Development Conditions applicable to the
premise relating to plumbing and drainage. i.e. conditions relating to a Material Change of
Use or Reconfiguration of a Lot.

(Reason: Conditions nominated on a Compliance Certificate for Plumbing and Drainage are
subservient to all other related Development Conditions.)

New On Site Sewerage Facility - Installation

The on-site sewerage facility consisting of the Earthsafe D10 — Model SCHHD10 CEA
03/2019 and 240m? of Fixed Surface Irrigation Wobbler type Sprinklers with a 120
micron filter installed within the delivery line to the tank as per assessed report by |
Design Waste Water Solutions are to be installed in their entirety before utilised for the
intended purpose. Flexible connections shall be provided at connection points to all septic
tanks and treatment plants.

Trade waste apparatus, septic systems, holding tanks, regulated pumpouts and/or grease
traps must be serviced and pumped out as required or at least every five (5) years, with
condition report results to be submitted to the Plumbing Services Branch:of Noosa Council.

(Reason: The effective operation of an on-site sewerage facility is reliant on the complete
and proper installation of the facility prior to use in accordance with manufacturer
recommendations and the associated design criteria.)

Stages for inspection of permit work that is on-site sewerage work

Section 65 of the Plumbing and Drainage Regulation 2019 requires that the local
government must inspect plumbing work that is permit work before the work is covered.

This condition requires each of the following stages of permit work be inspected.
(a) For a trench or sub-surface irrigation-
(i) Before filling with backfill; or

(ii) After substantially filling with backfill but leaving a cross-sectional area of the
trench or sub-surface irrigation not backfilled;

(b) After all pipes for the relevant on-site sewerage facility are connected, and effluent
resulting from sewage generated on the premises can be treated by the on-site
sewage treatment plant;

(c) If the relevant compliance permit imposes a condition requiring an assessment at 1
or more other stages of the work-each stage stated in the condition.

Stages for inspection of permit work.

Section 65 of the Plumbing and Drainage Regulation 2018 requires that the local
government must inspect plumbing and drainage work that is permit work before the work
is covered.

This condition requires each of the following stages of Permit Work to be inspected.

(1) Plumbing and Drainage Regulation requires each of the following stages of
compliance assessable work be assessed before being covered. -

(a) For plumbing or drainage laid under a floor slab or in another area where pipes
or fittings will bé covered-before the floor slab is laid or the pipes or fittings are
covered;

(b) For plumbing or drainage that is laid below ground level and external to a
building or other structure-before the backfill is placed;
Log in to download the original file

NSC Plumbing permit.pdf · 2.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.