Original source · versioned page text
NSC Plumbing permit
Development Conditions Compliance must be achieved with all other Development Conditions applicable to the premise relating to plumbing and drainage. i.e. conditions relating to a Material Change of Use or Reconfiguration of a Lot. (Reason: Conditions nominated on a Compliance Certificate for Plumbing and Drainage are subservient to all other related Development Conditions.) New On Site Sewerage Facility - Installation The on-site sewerage facility consisting of the Earthsafe D10 — Model SCHHD10 CEA 03/2019 and 240m? of Fixed Surface Irrigation Wobbler type Sprinklers with a 120 micron filter installed within the delivery line to the tank as per assessed report by | Design Waste Water Solutions are to be installed in their entirety before utilised for the intended purpose. Flexible connections shall be provided at connection points to all septic tanks and treatment plants. Trade waste apparatus, septic systems, holding tanks, regulated pumpouts and/or grease traps must be serviced and pumped out as required or at least every five (5) years, with condition report results to be submitted to the Plumbing Services Branch:of Noosa Council. (Reason: The effective operation of an on-site sewerage facility is reliant on the complete and proper installation of the facility prior to use in accordance with manufacturer recommendations and the associated design criteria.) Stages for inspection of permit work that is on-site sewerage work Section 65 of the Plumbing and Drainage Regulation 2019 requires that the local government must inspect plumbing work that is permit work before the work is covered. This condition requires each of the following stages of permit work be inspected. (a) For a trench or sub-surface irrigation- (i) Before filling with backfill; or (ii) After substantially filling with backfill but leaving a cross-sectional area of the trench or sub-surface irrigation not backfilled; (b) After all pipes for the relevant on-site sewerage facility are connected, and effluent resulting from sewage generated on the premises can be treated by the on-site sewage treatment plant; (c) If the relevant compliance permit imposes a condition requiring an assessment at 1 or more other stages of the work-each stage stated in the condition. Stages for inspection of permit work. Section 65 of the Plumbing and Drainage Regulation 2018 requires that the local government must inspect plumbing and drainage work that is permit work before the work is covered. This condition requires each of the following stages of Permit Work to be inspected. (1) Plumbing and Drainage Regulation requires each of the following stages of compliance assessable work be assessed before being covered. - (a) For plumbing or drainage laid under a floor slab or in another area where pipes or fittings will bé covered-before the floor slab is laid or the pipes or fittings are covered; (b) For plumbing or drainage that is laid below ground level and external to a building or other structure-before the backfill is placed;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.