Original source · versioned page text
NSC Plumbing permit
(if the soil classification for the site is H,E or P - a design showing the articulation of the sanitary drainage must be on site at the time of the inspection). (c) For plumbing installed in a building or other structure-before the cladding or lining covering the plumbing is fixed; (d) When the plumbing or drainage work, the subject of the request for compliance assessment, is completed; (2) The responsible person for the work must- (a) Request an assessment of the work at each of the applicable stages mentioned in subsection (1); and (b) For the stage mentioned subsection (1) (d)-make the request within 5 days after the work is completed; and (c) Before or when the work is assessed, give the local government details in the approved form (Form 7) of the responsible person. (3) The responsible person may request an assessment of the work only if the information or documents have been provided to the local government. (4) For the purposes of this section, compliance assessable work is completed when the work becomes operational. Approved Plans to be On-site The Responsible Person is to ensure that an up to date copy of Noosa Council approved plans are on-site when requesting an inspection of Plumbing and Drainage works. Approved plans must be available to the Plumbing Inspector for perusal of Permit Works for the site. (if the soil classification for the site is H,E or P - a design plan showing the articulation of the sanitary drainage must be on site at the time of the inspection). As-Constructed drawings to be lodged with Council The Applicant/Responsible person must supply in the approved form a As-constructed plan for the sanitary drainage and below ground water supply, to Noosa Council Plumbing Services. As-Constructed drawings must be lodged with Noosa Council Plumbing Services within 5 business days after the inspection/s of the service are complete. Drawings must contain comprehensive detail of the works undertaken and be of a professional standard in the approved form, (these may be hard copy format or electronic format). 5. REASONS FOR THE DECISION To ensure all plumbing work is carried out as per the Plumbing and Drainage Regulation 2019. 6. RELEVANT PERIOD OF APPROVAL This Plumbing Compliance Permit has effect for a period of two (2) years from the decision date 22 October 2019 and will therefore lapse 21 October 2021.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.