Council archive · source document
2017-05-04_Request for Extension to Relevant Period_REV A · 152006.1999
Attached to the e-mail Request for Extension to Relevant Period 152006.1999.01.
Specific Outcomes Probable Solutions Comments
behaviour; and
h) disturbance of buildings and features,
including natural features, of cultural
heritage significance.
Open space network S17.1 Open space corridors and existing O17 – Complies. The proposed
O17 An integrated open space network native vegetation in areas indicated in development provides an integrated
is established, enhanced and protected Schedule 5 – Map 3 are protected from open space network through
throughout the locality to— fragmentation and encroachment by protection of environmental
a) provide for both passive and active development. corridors. Development has been
recreational pursuits; designed around predominately
b) provide connectivity for pedestrians, disturbed areas on the site.
cyclists, and horse riders; Pedestrian and bicycle facilities is
c) provide access to Community Uses required to be provided for this
and buildings, public open space and the development as part of conditions
Noosa River; 25 to 29.
d) provide habitat connectivity for
wildlife;
e) protect watercourses and drainage
lines;
f) protect vegetation on steep slopes;
and
g) form a scenic backdrop for residential
development.
Noosa Trail Network S18.1 No solution provided O18 & O19 - Complies. Pedestrian
O18 A comprehensive network of bridle S19.1 Development includes linkages to and bicycle paths are required to be
trails and pedestrian and bicycle links is or between existing or future provided for this development as
established, enhanced and protected components of the Noosa Trail Network, part of conditions 25 to 29.
incorporating road reserves, State as indicated in Schedule 5 – Map 2;
forests, Council owned land and AND
private lands consistent with the S19.2 Development does not have an
lifestyle and outdoor recreation needs of adverse impact on the access functions
the Shire’s residents and visitors; of the Noosa Trail Network as indicated
AND in Schedule 5 – Map 2, including
O19 Existing and future pedestrian, severing of existing or future linkages; or
bridle trail or bicycle linkages are S19.3 Alternative linkages to those
retained as part of a Shire wide trail indicated in Schedule 5 – Map 2 are
network. provided;
AND
S19.4 Linkages to the Noosa Trail
Network are designed and constructed
in accordance with—
a) Australian Standard 2156.1 Walking
Tracks Part 1: Classification and
Signage to a minimum of a Class 4
Standard; and
b) Australian Standard 2156.2 Walking
Tracks Part 2: Infrastructure Design.
Pedestrian and bicycle pathways S20.1 Pedestrian and bicycle pathways O20 - Complies. Pedestrian and
O20 Safe and convenient pedestrian and are provided and retained where Bicycle paths are required to be
bicycle pathways are provided and indicated in the Priority Infrastructure provided for this development as
retained between and around key Plan in Part 15; part of conditions 25 to 29.
destinations. AND
S20.2 Contributions toward pedestrian
and bicycle pathways are provided in
accordance with the Priority
JFP Ref: M1775 REV. A Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-05-04_Request for Extension to Relevant Period_REV A.pdfRelated documentApplication case desk ↗
2017-05-04_Request for Extension to Relevant Period_REV A.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.