Original source · versioned page text
Planning Report
waste bins, with individual unit owners expected to transfer waste to this common collection.
Collection is able to be accommodated wholly within the boundaries of the site via a waste service
vehicle. A Waste Management Plan for the development is include at Attachment 6.
vii. Infrastructure servicing – The subject site is currently connected to all essential urban
infrastructure. Stormwater will be collected and treated on site and discharged into a legal point
of discharge in accordance with the Stormwater Management Plan included at Attachment 7.
Internal water, sewer, telecommunication and electrical connections will be finalised during detail
design.
3.3 Supporting Technical Reports
In support of this development application, the following specialist reports listed in Table 6 below have
been commissioned and accompany this planning assessment report:
Table 6: Supporting documentation
Report title Prepared by Date Reference
Landscape – Operational Works Coveys Associates Consulting November Attachment 4
Plans Engineers 2020
Civil – Material Change of Use & Coveys Associates Consulting November Attachment 5
Operational Works Engineers 2020
Waste Management Plan Innovative Planning Solutions November Attachment 6
2020
Stormwater Management Plan Coveys Associates Consulting November Attachment 7
Engineers 2020
Page 10 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.