Skip to the record
Every meeting, every word.

Council archive · source document

Beach Road Retreats Stage 1 Conditions · 132007.742.05

Attached to the e-mail 132007.742.05 Request to Extend Relevant Period (Stage 1).

of 19

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

132007.742.04

 

selrsaat te.

Department of Natural Resources and Water —

Referral agency response
Given under Section 3.3.16 of the Integrated Planning Act 1997

Suet

1. Application details

1.1. Applicant’s name Wolter Consulting Group

1.2. Property description Lot 7 on RP844337

1.3, Development type Material Change of Use (MCU)

1.4. Assessment manager (AM) Noosa Council ‘
1.5. AM reference 2007/742

1.6. Referraldate 21 May 2007

1.7. Our references eLVAS — 2007/005432

File — GY V/000902
Trackjob — 1ICOSO7GYMO0010

2, Concurrence agency response

The chief executive of the Department of Natural Resources and Water (NRW)
would like to inform the AM that NRW has no concurrence agency requirements
in regard to the application.

3. Reasons for the concurrence agency response

NRW has assessed the application against the Concurrence Agency Policy for
Material Change of Use (MCU) 20 November 2006 and has determined that the
application meets the requirements of Criteria Table B because clearing as a result
of the MCU will only occur— .

e Foran urban purpose in an urban area on freehold land; and

e ‘In remnant vegetation that does not contain an endangered regional
ecosystem, where the land is not shown on a PMAV.

4. Aboriginai cultural heritage advice

Under Section 23 of the Aboriginal Cultural Heritage Act 2003, a person who
carries out an activity must take all reasonable and practicable measures to ensure
that the activity does not harm Aboriginal cultural heritage (the “cultural heritage
duty of care”). Maximum penalties for breaching the cultural heritage duty of care
are $750 000 for a corporation and $75 000 for an individual.

Applicants will comply with the cultural heritage duty of care in relation to.
Aboriginal cultural heritage if they are acting in compliance with the cultural
heritage duty of care guidelines gazetted under the Aboriginal Cultural Heritage
Act 2003, available on the NRW’s website, or in accordance with an agreement
with the Aboriginal party for the area or a cultural heritage management plan
approved under Part 7 of the Aboriginal Cultural Heritage Act 2003.

 

Page 1 of 2

cme.
te

PD-DA-FM383/5-09/08/2010 Page 15 of 19

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Beach Road Retreats Stage 1 Conditions.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.