                                             CONSTRUCTION MANAGEMENT PLAN



Site :                     20 Mitti Street, Noosa Heads Qld 4567

RPD:                       Lot 2 RP173874

Prepared by :              Steven Essex
                           Director, SX Constructions Pty Ltd (Hereinafter SX Constructions)
                           Contact : 0437 733 102 Email: [email protected]

Prepared :                 18/08/20 (Draft 1)

                           For the construction of Operational Works Relating to a Reconfiguration of a Lot

Application No:            OPW20/0127



Introduction

This Construction Management Plan (hereinafter “CMP”) has been completed in response to the information request from
Noosa Council dated 17/08/20. The purpose of this CMP is to ensure that any disturbance to traffic, both vehicular and
pedestrian, around the site is minimised, as well as ensuring that all site operations are conducted in a safe manner for all
parties involved. The CMP will form part of the induction process for all personnel on site to ensure that every person who
works on the site is made aware of the required process to be followed for site deliveries and parking.

.

1. CMP Details:

                  Traffic Management:

         a.       i. There will be no work or deliveries taking place on the road and as such no road closure will be required.
                  Vehicular access will be maintained at all times on Mitti Street. All site facilities will be located onsite during
                  the construction period.
                  ii. Safe pedestrian access will be maintained at all times on Mitti Street, both during daily construction and
                  after daily construction has ceased.
                  iii. The site will be fully fenced preventing any unauthorised access onto site.
                  All temporary fencing will be erected within the boundaries of the site. The fence will be orange barrier
                  fencing. All appropriate safety signage will be in place on the fence in accordance with construction OH&S
                  requirements.
                  iv. Safe parking will be available for workers, machinery and appliances onsite at 20 Mitti Street. Where these
                  places are full, parking will be in the two way section of Mitti Street and strict adherence to public parking
                  restrictions will be maintained.
                  v. No queuing of trucks will be required, all deliveries to site will be via the driveway at 20 Mitti Street.
                  vi. No large trucks / bulk deliveries will be authorised, all materials will be delivered by small vehicles (such
                  as Noosa Mini Mix) so as to comply with the 9 tonne gross load limit of Park Road.
Full text of the other 3 pages

Page 2

         vii. Daily inspections of Mitti Street and the driveway at 20 Mitti Street will be conducted to ensure safe
         vehicle and pedestrian access. These will take place twice per day by SX Constructions personnel, before and
         after construction works.

b. SX Constructions provides the following works programme:
 Works                                   Start                                      Finish

 Stage 1 -

 Stage 2 -

 Stage 3 -

 Stage 4 -

 * Note this schedule does not allow for delays caused by inclement weather or any other unforeseen circumstances.

c. The general public, adjoining owners and relevant emergency and public services will be provided information
relating to the agreed construction times, impacts on traffic and delivery of services via signage fixed to the site fencing
which will also include contact details for Steven Essex, Director of SX Constructions if further clarification is required.
d. The works public notice sign fixed to the site fence (detailed above) will include contact details for Steven Essex,
Director of SX Constructions, who will manage complaints in conjunction with the owners and any other relevant
party.

Other safety signage will include 1 x sign at the beginning of the one way section of Mitti Street advising the public
'Construction Work Ahead Proceed with Care' and 1 x sign at the top of the driveway advising delivery drivers/public
of 'Construction Site No Loading from Street'. Further to these custom site signs SX Constructions will fix the following
generic construction safety signs to the site fence:
 1.                                                            2.




 Reminder to staff and worksite visitors of potential          Site specific induction and safety rules - provides
 hazards and precautions required within these safety          reference of site safety rules and emergency procedures
 signs.

Page 3

         e. SX Constructions will utilise the Noosa Shire Council Landfill and Resource Recovery centre at 561 Eumundi Noosa
         Rd, Doonan as the external dump site. Waste material will be transported to the dump site in a Mazda BT-50 utility
         vehicle via route detailed below:




8. All works will be supervised by a RPEQ, Barlow Shelley Consulting Engineers (Aust) Pty Ltd. They will certify that all works
conform to the Operational Works permit.

OTHER ITEMS

Access to Building Site

Access to the building site will be via the existing driveway at 20 Mitti Street.

Work Hours
The construction site will only operate between 7:00am to 5:00pm Monday to Friday and exclude Saturday’s, Sunday’s and
Public Holidays as per the allowable noise limits listed in the Noosa Council "Noise Pollution; Building Work" fact sheet.

Page 4

Signed :



……………………………………………………………………………….   ……………………………….2020
Steven Essex

Director

SX Constructions Pty Ltd

Used in these records

About this file

File size
312 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Management Plan 20 Mitti St - DRAFT 1.pdf · 312 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.