Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Construction Management Plan 20 Mitti St - DRAFT 1 · OPW20/0127

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
         vii. Daily inspections of Mitti Street and the driveway at 20 Mitti Street will be conducted to ensure safe
         vehicle and pedestrian access. These will take place twice per day by SX Constructions personnel, before and
         after construction works.

b. SX Constructions provides the following works programme:
 Works                                   Start                                      Finish

 Stage 1 -

 Stage 2 -

 Stage 3 -

 Stage 4 -

 * Note this schedule does not allow for delays caused by inclement weather or any other unforeseen circumstances.

c. The general public, adjoining owners and relevant emergency and public services will be provided information
relating to the agreed construction times, impacts on traffic and delivery of services via signage fixed to the site fencing
which will also include contact details for Steven Essex, Director of SX Constructions if further clarification is required.
d. The works public notice sign fixed to the site fence (detailed above) will include contact details for Steven Essex,
Director of SX Constructions, who will manage complaints in conjunction with the owners and any other relevant
party.

Other safety signage will include 1 x sign at the beginning of the one way section of Mitti Street advising the public
'Construction Work Ahead Proceed with Care' and 1 x sign at the top of the driveway advising delivery drivers/public
of 'Construction Site No Loading from Street'. Further to these custom site signs SX Constructions will fix the following
generic construction safety signs to the site fence:
 1.                                                            2.




 Reminder to staff and worksite visitors of potential          Site specific induction and safety rules - provides
 hazards and precautions required within these safety          reference of site safety rules and emergency procedures
 signs.

Used in these records

About this file

File size
312 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Management Plan 20 Mitti St - DRAFT 1.pdf · 312 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.