Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Construction Management Plan 20 Mitti St - DRAFT 1 · OPW20/0127

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
         e. SX Constructions will utilise the Noosa Shire Council Landfill and Resource Recovery centre at 561 Eumundi Noosa
         Rd, Doonan as the external dump site. Waste material will be transported to the dump site in a Mazda BT-50 utility
         vehicle via route detailed below:




8. All works will be supervised by a RPEQ, Barlow Shelley Consulting Engineers (Aust) Pty Ltd. They will certify that all works
conform to the Operational Works permit.

OTHER ITEMS

Access to Building Site

Access to the building site will be via the existing driveway at 20 Mitti Street.

Work Hours
The construction site will only operate between 7:00am to 5:00pm Monday to Friday and exclude Saturday’s, Sunday’s and
Public Holidays as per the allowable noise limits listed in the Noosa Council "Noise Pollution; Building Work" fact sheet.

Used in these records

About this file

File size
312 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Management Plan 20 Mitti St - DRAFT 1.pdf · 312 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.