Original source · versioned page text
Report for Minor Change to Existing Approval - 7 Arakoon Cres, Sunshine Beach
PO16 Development is designed located in the Flood Hazard Area as The site is not mapped as
and sited to ensure risk to people shown on Flood Hazard Overlay Map containing flood hazard areas.
and property from flooding is in Schedule 2, the finished floor level
avoided or minimised. of habitable rooms is at least 300
millimetres above the Defined flood
event (DFE).
OR
AO16.2 Where the DFE has not
been modelled for the area, the
finished floor level of habitable
rooms is at least 500 millimetres
above the highest recorded flood.
Editor's Note—The QDC mandatory
provisions MP3.5 also apply to the
construction of buildings in flood
hazard areas.
Major Electricity AO18.1 Development including any Not applicable
Infrastructure & Substations sensitive land uses is at least: The site is not mapped as
PO18 Development is sufficiently 1. 50 metres from a containing major electricity
separated from major electricity transmission substation; infrastructure or substations.
infrastructure and substations to 2. 10 metres from any other
minimise the likelihood of substation; and
nuisance or complaint.
3. 30 metres from a
transmission line easement.
AO18.2 Habitable buildings are not
located within an easement for a Not applicable
distribution line. The site is not mapped as
containing major electricity
infrastructure or substations.
PO19 Development is located and AO19 Noise emissions do not Not applicable
designed to avoid or minimise exceed 5db(A) above background The site is not mapped as
noise nuisance from the use of noise level internal to a habitable containing major electricity
infrastructure. building measured in accordance infrastructure or substations.
with AS1055.
PO20 Wherever practicable AO20 Where adjoining substations Not applicable
habitable buildings are orientated or major electricity infrastructure, The site is not mapped as
to avoid direct overlooking of habitable buildings are orientated so containing major electricity
major electricity infrastructure or that the majority of outdoor living infrastructure or substations.
substations. areas and windows of habitable
rooms face away from the
infrastructure.
Earthworks and Drainage AO21 Filling other than accessways: Complies with AO21
PO21 Earthworks and drainage 1. does not extend more than
operational works do not directly, the equivalent of 3 metres around
23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.