Original source · versioned page text
Report for Minor Change to Existing Approval - 7 Arakoon Cres, Sunshine Beach
indirectly or cumulatively cause the main building, measured from
adverse impacts external to the the outer walls of the building;
development site by: 2. is limited to a maximum of
1. causing ponding of water 500m2; and
on the site or nearby land; 3. does not impact on the local
2. increasing flooding, which drainage of adjoining properties.
adversely affects the safety or use
of any land upstream and
downstream;
3. adversely affecting the
flow of water in any overland flow
path; and
4. adversely affecting the
privacy or visual amenity of
surrounding property.
Editor's Note—Development
should ensure that filling does not
impact on the amenity and
usability of neighbouring
properties (including loss of
privacy caused by relative level
changes) or offsite drainage.
INFRASTRUCTURE
Infrastructure Agreement applicable? Not applicable
Existing lawful use for residential Development: 1x 3+ bedroom dwelling
house
Total lawful residential development on the site upon completion 1x 3+ bedroom dwelling
of the proposed development: house
Existing impervious area (m²). Non-residential development only Not applicable
Total impervious area (m²) on the site upon completion of the Not applicable
proposed development. Non-residential development only.
Existing Non-residential GFA Not applicable
Total GFA – Non-residential upon completion of the proposed Not applicable
development
Services available/ Water (Y); Sewerage (Y);
connections to the property Electricity (Y)
Telecommunications (Y)
OVERLAY
24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.