EGX_PROD_n5390549_28_Eenie_Creek_Road,_Noosaville_Part_of_L3_on_SP246584

Attached to the e-mail MCU16/0081 - Energex advice agency response - 28 Eenie Creek Road Noosaville.

of 5

Page text shows just the words. Original shows the document exactly as it was published.

                                                    5



   Proposed underground services such as stormwater, sewerage, water and the like
    are to be kept to the outer edge of the easement. Services crossing the easement
    should be as near as practicable to right angles to the overhead conductor direction
    and not within 10 metres of any tower, pole or stay. Pipelines and crossings are
    to be clearly marked. Please submit the relevant design drawings to the Energex
    for review. The identification, assessment and mitigation of any possible hazards in
    the service due to electromagnetically induced voltages, is the responsibility of the
    Developer.

   Any cut in the vicinity of a structure or between a structure and the road kerb will
    need to be stabilised by a retaining wall. The retaining wall design and location is
    to be submitted to Energex for approval.

   Any costs incurred by Energex as a result of the works on the easement are to be
    met by the property Developer / owner.

   Access to the easement and access along the easement must be available to
    Energex personnel and heavy equipment at all times. Energex will require the
    Developer / owner to supply and install gates where fencing prohibits access to and
    along the easement area. To enable travel along the easement at anytime the
    gates must be series locked with an Energex padlock. Both the padlock and a
    design drawing of an acceptable gate will be provided by Energex.

   At all times the following clearance must be maintained from the top of any
    machinery moving in the vicinity of energised conductors:

         132kV and 110kV conductors – 4.5m minimum clearance
         33kV and 11kV conductors – 3m minimum clearance
         Should it be necessary to transport equipment or extend any equipment, such
          that these clearances cannot be confidently maintained, you are required to
          contact our office to ascertain whether a Safety Officer is required on–site. All
          operators of machinery are to be made aware of the presence of high voltage
          conductors.

   Any proposal for landscaping on the easement must have prior approval from
    Energex. Please submit the relevant landscaping design to Energex for approval.
    When considering landscape designs the planting of trees must be kept to the
    edges of the easement and not under any overhead conductors. When mature,
    plants or trees must not grow in excess of 3.5meters in height. Please visit
    https://www.energex.com.au/home/safety/safety-around-the-network/safetree-
    plants for a full list of safetree plants.




Reference:     HBD 5390549 346062

                            Did you know Energex has a referral website?
        https://www.energex.com.au/home/our-services/connections/development-application-referrals
Log in to download the original file

EGX_PROD_n5390549_28_Eenie_Creek_Road,_Noosaville_Part_of_L3_on_SP246584.pdf · 230 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.