Original source · versioned page text
Att 5 - Codes Assessment
Attached to the e-mail Council Road Upgrade, Attachments inc Waste Mgmt Plan & Geotech (Email 2 of 3).MCU17/0054.
Specific Outcomes and Probable Solutions for the Natural Hazards (Flooding) Code
column 1 column 2 Column 3
Specific Outcomes Probable solutions (if code assessable) Compliance
Hazardous materials S14.1 Materials manufactured or stored on-site Not Applicable
O14 Development avoids the release of are not hazardous or noxious, or comprise
hazardous materials into floodwaters and materials that may cause a detrimental effect on
the environment. the environment if discharged in a flood event; or
S14.2 Structures used for the manufacture or
storage of hazardous materials are—
a) located above the defined flood level; or
b) designed to prevent the intrusion of floodwaters.
Essential network infrastructure S15.1 Components of the essential network Not Applicable
O15 Essential network infrastructure (e.g. infrastructure that are likely to fail or may result in
electricity, water supply, sewerage and contamination when affected by flood water—
telecommunications) maintains effective a) comply with Table 13.12; or
function during and immediately after b) are designed and constructed to exclude water
flood events inundation or infiltration and resist hydrostatic and
hydrodynamic forces as a result of inundation.
O16 Community Uses and Infrastructure S16.1 Community Uses and Infrastructure Uses Not Applicable
Uses are able to function effectively are sited and constructed to ensure that floor
during and immediately after flood events. levels comply with flood immunity requirements
specified in Table 13.12; OR
S16.2 Essential community infrastructure which is
located below the specified flood immunity
requirements— a) is designed and constructed to
function effectively during and immediately after
the recommended flood level flood event; and
b) has an emergency rescue area above the
probable maximum flood if it is for emergency
services (including emergency shelters, police
facilities, hospitals and associated facilities).
Development siting and design S17.1 No probable solution. - The site is proposed to be
O17 Development provides that for all filled for the commercial
flood events up to and including the development. Prelodgement
discussions with Noosa
defined flood event—
Council did not require any
a) the safety of people on the site is flood study to be carried out on
protected; b) the capacity to use land in the existing commercial zoned
the flood plain is not adversely affected; site within the Noosa
and c) the risk of damage to property on floodplain.
the site is avoided or minimised as far as - The finished floor levels are at
practicable. AND 2.5m AHD and is above the
1% AEP for the site.
O18 All lots have sufficient area that is S18.1 The minimum area above flood level for
above the define flood event flood level or each lot, is in accordance with Table 13.13; AND
where modelling is not available, the S18.2 Where the existing roads servicing a
highest recorded flood level, to safely and development provide a specific flood immunity (as
adequately accommodate the intended determined by the Qld Transport Road and
use; AND Drainage Design Manual, Queensland Urban
O19 Development is undertaken in a Drainage Manual and the Australian Rainfall and
manner that ensures— a) natural Runoff Guide), all lots have access to the flood
hydrological systems are protected; b) free area identified in Table 13.13 that matches
natural landforms and drainage lines are the road immunity; AND
maintained to protect the hydraulic S19.1 Flood immunity for development areas is
performance of waterways; and c) not achieved by filling land below the 1% AEP
development integrates with the natural (1:100 year ARI) flood level; or
landform rather than modifying the S19.2 Where modelling is not available, flood
landform to suit the development; immunity for development areas is not achieved by
filling land below the highest recorded flood level.
O20 Development does not compromise S20.1 Development provides an effective
the safety of people resulting from evaluation route that remains passable, with
residual flood risk associated with events sufficient flood warning time, to enable people to
that exceed the defined flood event, up to progressively evacuate to safe areas above the
Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.