Att 5 - Codes Assessment
Attached to the e-mail Council Road Upgrade, Attachments inc Waste Mgmt Plan & Geotech (Email 2 of 3).MCU17/0054.
column 1 column 2 Column 3
Specific Outcomes Probable solutions (if code assessable) Compliance
and including the probable maximum probable maximum flood in the face of advanced
flood. flood waters for events exceeding the defined
flood event; OR
S20.2 Development provides for an area of
sufficient size and dimensions on site above the
probable maximum flood that allows for safe
congregation and refuge.
Earthworks No solution provided. - The site is proposed to be
O21 Filling or excavation only occurs filled for the commercial
where it— development. Prelodgement
discussions with Noosa
d) results in the protection, rehabilitation
Council did not require any
and repair of ecologically important areas, flood study to be carried out on
watercourses, drainage lines and the existing commercial zoned
wetlands; and site within the Noosa
e) does not adversely impact on the floodplain.
overall hydrology, hydraulics and flood
capacity of the waterway, and does not
result in a reduction in flood storage
capacity.
f) does not adversely impact on water
levels on properties elsewhere.
Flood impacts S22.1 In the Flood Hazard area, as identified on - The site is proposed to be
O22 Development does not directly, the Natural Hazards Overlay Maps, or in areas filled for the commercial
indirectly or cumulatively alter the flood otherwise determined to be subject to the defined development. Prelodgement
discussions with Noosa
characteristics external to the flood event—
Council did not require any
development site for all flood events up to a) there is no loss of on-site flood storage flood study to be carried out on
and including the defined flood event capacity; and the existing commercial zoned
based on— b) all changes to level, depth, duration and velocity site within the Noosa
a) current climate conditions; and of floodwaters are contained within the site for all floodplain.
b) incorporating an appropriate allowance flood events up to and including the defined flood
for the predicted impacts of climate event based on current climate and predicted
change. impacts of climate change at 2100.
Building design and building form S23.1 Buildings and materials and surface The design includes a gentle slope
O23 Development ensures that building treatments used below the defined flood event are from the road to the tenancies
design and built form accounts for the resilient to water damage and do not include wall facilitating pedestrian flows and
visual and physical connectivity
potential flood risks and are resilient to cavities that may be susceptible to the intrusion of
between the footpath and ground
flood events by— water and sediment; floors. Landscaping is provided
a) ensuring building materials used have S23.2 Buildings are designed to integrate well with along the Earl Street frontage to
high water resistance and will improve the the street level and the levels of adjoining screen the level difference between
resilience of a building during and after a properties to facilitate pedestrian flows and visual the tenancy and the higher finished
flood event; and and physical connectivity between the footpath floor level.
b) maintaining a functional and attractive and ground floors;
street front address appropriate to the S23.3 Buildings incorporate appropriate screening
intended use. to ensure that any under-storey is not visible from
the street, where such screening does not impede
flood water flows;
S23.4 Residential buildings minimise risk from
flooding by providing parking and other low
intensive, non-habitable uses at ground level;
S23.4 Non-residential buildings and structures are
oriented to the street by activating the street
frontage with appropriate uses and urban design
treatments such as recessed wall treatments,
screening or landscaping, whilst allowing for flow
through of flood waters on the ground floor.
Disaster Management S24.1 Development does not— - The site is proposed to be
O24 Development supports, and does not a) increase the number of people calculated to be filled for the commercial
unduly burden, disaster management at risk from flooding; development. Prelodgement
discussions with Noosa
response or recovery capacity or b) increase the number of people likely to need
Council did not require any
capabilities. evacuation; flood study to be carried out on
c) shorten flood warning times; or the existing commercial zoned
Page 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.