SPECIAL MEETING MINUTES 27 JANUARY 2021
MCU20/0012 – Car park
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be
complied with prior to the use commencing, and then compliance
maintained at all times while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are
listed in the following table unless otherwise amended by these conditions.
Plan No. Re Plan/Document Name Date
v.
500557 – DA00 A Project Cover Sheet prepared by 22 October 2020
Noosa Council
500557 – DA01 A Design and Existing Legends 22 October 2020
prepared by Noosa Council
500557 – DA02 A Typical Sections prepared by 22 October 2020
Noosa Council
500557 – DA03 A Maple Street - Carpark Area 1 22 October 2020
prepared by Noosa Council
500557 – DA04 A Design Features - Carpark Area 22 October 2020
2 prepared by Noosa Council
500557 – DA05 D Design Features – Pathway 22 October 2020
Connection prepared by Noosa
Council
Carparking
3. Carparking must be provided and sealed in accordance with the approved
plans. All carparking, must be provided prior to the commencement of the
use of the playground approved under development application
MCU20/0013.
4. The concrete driveway on drawing DA04 Rev. A Design Features Carpark
Area 2 is not to be constructed as part of these works.
5. All car parking shall be kept maintained and line-marked in a condition fit
for use.
6. Appropriate signs shall be provided indicating the site as a Council Car
park.
Pathways
7. Concrete pedestrian pathways, detailed on the plans, must be provided in
accordance with Council’s standard drawing RS-065 and any associated
addendum. The works must include:
a. Any reinstatement of verge area must smoothly match the new
pathway,
b. The provision of topsoil, turf and any necessary stormwater drainage
measures to prevent ponding and excessive runoff over the
pathways.
Page 3 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.