Original source · versioned page text
2021-01-27 Special Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SPECIAL MEETING MINUTES 27 JANUARY 2021
Stormwater Drainage Management
8. In conjunction with the development application for operational works,
provide an updated Stormwater Quality Management Plan and engineering
drawings which are based on a revised model which addresses the
following:
a. Only include those sub-catchments which form part of the proposed
works or which contribute flow to the devices proposed to treat the
proposed works;
b. Only include treatment devices which actually exits or which are
proposed to be built or refurbished as part of the proposed works;
c. Existing GPTs are not to be modelled as receiving and treating
roofwater unless this physically occurs on site; and
d. Additional treatment devices are to be provided as necessary within
the car parking area in order to meet the pollutant load reduction
design objectives specified by the Water Sensitive Design Code.
9. Proposed and refurbished bioretention devices are to be designed
generally in accordance with the Bioretention Technical Design Guidelines
(Water by Design, 2012) and IPWEAQ standard drawings
10. Permanent educational signage must be erected to educate the public
about the function of the bioretention device(s). The dimensions, standard,
presentation and location of the educational signage must be in
accordance with an Operational Works approval.
Public Services
11. All necessary approvals from external service providers and external
parties on which the development works are proposed or impacted on must
have been obtained and a copy of approval/s supplied to Council prior to
the commencement of the works.
Easements
12. Where required, any public or third party infrastructure located on the
subject site must be placed within an easement registered against the title
of the property and in accordance with the requirement of the public service
provider.
13. All easements must be designed in accordance with the planning scheme
and granted at no cost to the Grantee. Where the Grantee is Council or a
service authority, the easement documentation must be in accordance with
the Grantee’s standard easement terms. Draft easement documentation
must be submitted to Council for endorsement.
Landscaping Works
14. The development site must be landscaped. The works must be undertaken
in accordance with the Noosa Plan 2020 Planning Scheme Policy 2 –
Landscaping for that specific area and must include in particular:
a. Carpark shade trees in a minimum pot size of 45L for every four
carparks
b. Carpark shade trees must have sufficient structured soils to allow for
proper root growth
Page 4 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.