SPECIAL MEETING MINUTES 27 JANUARY 2021
500557 – A Typical Sections prepared by Noosa Council 22 October
DA02 2020
500557 – A Maple Street - Carpark Area 1 prepared by 22 October
DA03 Noosa Council 2020
500557 – A Design Features - Carpark Area 2 prepared 22 October
DA04 by Noosa Council 2020
500557 – D Design Features – Pathway Connection 22 October
DA05 prepared by Noosa Council 2020
500557 – A Library Carpark Reconfiguration Plan 22 October
DA06 prepared by Noosa Council as annotated 2020
by Council
500557 – A Design Features - Carpark Area 3 prepared 6 October
DA07 by Noosa Council as annotated by Council 2020
Currency Period
3. This development approval lapses if the use has not happened by 29
January 2027, unless an application to extend the currency period is
approved by Council.
Stormwater Drainage Management
4. Stormwater must be treated in accordance with the recommendations of
the Stormwater Quality Management Plan Revision 1 prepared by
Callaghan and Toth dated July 2020.
Flood Risk
5. All infrastructure with potential to be impacted by flood waters, including
electrical and plumbing fixtures and pump-room plant and equipment is to
be located above, or be able to safely withstand the 1%AEP flood level
corresponding to year 2100 planning period.
6. An automatic flood warning system incorporating both an audible and
visual alarm is to be provided to alert visitors to evacuate the site as soon
as flood waters begin to impact the playground and with sufficient warning
time to ensure full site evacuation prior to evacuation routes becoming
inundated.
7. The playground design is to be amended to eliminate the risk of isolation
of all site areas by rising flood waters. This may involve either modification
to site levels or provision of linking elevated walkways and evacuation
routes which remain flood-free until each area of the site which the
evacuation routes service is itself inundated.
8. The playground design and associated flood model is to be amended to
eliminate any increases in the flood levels affecting over-floor flooding at
adjacent buildings for all flood events.
9. Provide an updated flood emergency preparedness and management plan
which incorporates the above changes and which includes RPEQ
certification that the proposed final playground design achieves an
acceptable and tolerable level of flood risk. This plan must be completed
and certified prior to commencing works on site.
10. Any fencing must be designed in a manner so that it does not impede flood
waters or lead to a blockage.
Page 6 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.