07/1452 - Preliminary building works assessable against planning scheme [As Published]
INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
For mote information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24.
Ifyou answered "YES" to Q12, the application
triggers referral to the Port Authority.
The Port Authority is a concurrence agency if the
development is -
within 200m of a shipping channel or an entry
and exit shipping corridor for the part
within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil|
grounds;
within 1000m of a planned port facility
identified in a land use plan approved under
the Transport infrastructure Act 1994,
in all other situation the Port Authority is an
advice agency.
Marinas
For more Information refer to Guide 18, For
information about whether a marina is prescribed
tidal work refer to Guide 24. The locat
goverment is the assessment manager for all
prescribed tidal work.
\f you answered "YES" to Q13, the application
tiggers referral to Queensland Fire and Rescue
Service as an advice agency.
IDAS Assessment Checklist, Version 20, 2 April 2007
12, Does the application involve development below high water mark’ and within the limits of a port
under the Transport infrastructure Act 1994?
NO
(11 YES - complete Part M of Form 1, or Part P of Form 4 if the work Is prescribed tidal work
13. Does the application involve operational work that is tidal work for a marina‘? with more than 6
vessel berths?
[No
(DYES -comptete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
Tidal works in strategic port land tidal
areas
For more information refer to Guide 18.
Unless you answered "NO" to 014, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application.
Heritage
For further information refer to Guide 19.
\f you answered "YES" to Q15, the application
triggers referral to the land Hi
Council as concurrence agency for the
application,
Unless you answered “none of the above" to
Q15(b), the application involves referral to the
Environmental Protection Agency as an advice
agency for the application
Does the application involve tidal works within a strategic port land tidal area2°?
NO
YES - complete Part M of Form 1
15. Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?
0
YES - complete Part C of Form 1
15(b)The application involves: (tick applicable boxes)
{1 () a material change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;
(ii) reconfiguring a tot if the lot shares a common boundary with a protected area or
registered place under the Queensiand Heritage Act 1992;
none of the above.
vi (iii)
Declared catchment areas
For more information, including a list of the
declared catchment areas within Queensland,
refer to Guide 13.
Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).
If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.
16. The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)
(1 (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
C1) (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
none of the above
Q (il
18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pollution) Regutalion 1995,
20 Strategic port Sand tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land,
Page 5
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.