07/1452 - Preliminary building works assessable against planning scheme [As Published]

of 23

Page text read automatically using OCR, there may be inaccuracies

INTEGRATED PLANNING ACT 1997

Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more Information about prescribed tidal work in
local government tidal areas refer to Guide 24.
Uniess you answered “none of the above” to Q9,
the application requires assessment by the
Environmental Protection Agency (EPA).

If an agency other than EPA Is the assessment
manager for the application, EPA is a
concurrence agency for the application in
elation to this matter.

Local govemment is the assessment manager
for all prescribed tidal work.

DW
oii
Diiiy

Ww)

IDAS Assessment Checklist, Version 20, 2 Aprii 2007

9. The application involves operational work that is: ( tick the applicable boxes)

tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

tidal work that is prescribed tidal work" other than in a canal'2 -compiete Part P of Form 1;
or

carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) to (i) below are licked.

(1 {a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;

constructing a canal intended to be connected to tidal waters;

constructing an artificial waterway;

reclaiming land under tidal water;

disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;

draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

temoving or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

none of the above.

J b)
Oe
Od)
Oe)
Of
O@)

Ch)
Ov

 

Operational work below high water
mark

For more information refer to Guide 18. For
more information about prescribed tidal work in
local government tidal areas refer to Guide 24.
Unless you answered “none of the above" to
Q10, the application triggers referral to
Queensland Transport (QT) (Maritime Safety
Qld) as a concurrence agency.

Local goverment is the assessment manager
for ail prescribed dat work,

Miiv)

10, The application involves operational work that is: (tick the applicable box/es)
( (i) tidal work’ as defined under the Coastal Protection and Management Act 1995 (the

Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; Or

C1 (ii) tidal work that is prescribed tidal work"4 - complete Part P of Form 1; OF
C1 (iii) carried out within a coastal management district’ under the Coastal Act and for -

Oe)

0 (b)
O(c)

disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of Form 1;

reclaiming land under tidal water - complete Part M of Form 1; OF

constructing a canal, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;

none of the above.

 

Coastal management

For more information refer to Guide 18.

Unless you answered "none of the above" to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).

If an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
elation to this matter.

10 Tidal work is defined in sch 10 of the (PA.

Oi
Oi

Diy
Ow
$d)

 

11, The application involves: (tick the applicable box/es)

a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district

a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -

« the construction of a new premises with a GFA'S of at least 1000m2

« the enlargement of the GFA of existing premises by more than 1000m?2

reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

reconfiguring a lot'’ assessable under schedule 8 of the {PA and in connection with
the construction of a canal - complete Part M of Form 1

none of the above

41 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work Is defined in the Coastal Protection and Management Regutation 2003 and includes certain tidal works completely or partly within a local government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act

16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

17 Under s117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the appfication for the operational works to construct the artificial waterway.

Page 4

Log in to download the original (07_1452 - Preliminary building works assessable against planning scheme [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.