Skip to the record
For the highest quality transcripts.

Original source · versioned page text

07/1452 - Preliminary building works assessable against planning scheme [As Published]

of 23

Page text read automatically using OCR, there may be inaccuracies

INTEGRATED PLANNING ACT 1997
SEQ Regional Plan

For more information refer to schedule 2 of the
IP Regulation.

Refer to Chapter 2, part 5A and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for retevant
definitions.

Uniess you answered "none af the above” to
Q20, the application requires assessment by the
Office of Urban Management (OUM).

Fisheries matters

For more information refer to schedule 2of the IP
Regulation.

Unless you answered “none of the above" to
Q21, the application requires assessment by the
Department of Primary Industries and Fisheries
{DPI&F).

Ifan agency other than OPI&F is the assessment
manager for the application, OPI&F is a
concurrence agency for the application in
relation to items (i) ~ (Iv) and an advice agency
in relation to item (v).

IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable box/es) -
(1 (i) amaterial change of use of premises -
(a) in a Major Development Area in the Urban Footprint for -
OO (i) anurban activity -
(1 inan area included in a structure plan where the IPA, section 3.1.6
applies;
(11 inan area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2: or
« impact assessment is required under the relevant planning scheme
0 (ii) intensive animal husbandry, or

O (ii) residential development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area for -
O (i) anurban activity and not specified in section 2.4(2); or
C1 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the Investigation Area for -
CD (i) anurban activity and not specified in section 2.10(2);
© (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
C1 (ii) intensive animal husbandry

Osi) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
A (iii) none of the above

21. The application involves: (tick the applicable box/es}
CO (i) anassessable material change of use for aquaculture - complete Part O; of Form 1;

LO (li) assessable operational work that is the construction or raising of a waterway barrier -
comptete Part Os of Form 1;
Di

assessable operational work completely or partly within a declared fish habitat area.
complete Part Oz of Form 1;

0 (iw)

Ow)

plant - complete Part O2 of Form 1;

development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;

none of the above.

 

assessable operational work that is the removal, destruction or damage of a marine
wi)

Page 7

Log in to download the original (07_1452 - Preliminary building works assessable against planning scheme [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.