07/1452 - Preliminary building works assessable against planning scheme [As Published]

of 23

Page text read automatically using OCR, there may be inaccuracies

INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport

For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Regulation.
Unless you answered “none of the above”, the
application triggers referral to QT as a
concurrence agency.

IDAS Assessment Checklist, Version 20, 2 April 2007

22. The application involves: (tick the applicable box/es)—

(J (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

C1 (i) reconfiguring a tot—

(J (a) onland that is completely or partly within a public transport corridor, and the
total number of lots increases;

(1 (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;

O(c) _ onland that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m2 or greater,

[J (d) for a residential purpose within the 25 ANEF contour for an airport;

Cl(e) _ fora residential purpose resulting in 100 or more allotments.

LC (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

(1 (a) is completely or partly within a public transport corridor or a future public
transport corridor;
{1 {b) _ will resutt in work that encroaches into an airport's operational airspace.
[Xl (iv) none of the above.

 

 

 

 

Railway safety and efficiency 23. The application involves: (tick the applicable box/es)—
For more information refer to Guide 23, schedule i) a material change of use assessable against the planning scheme for a purpose
BA ofthe IPA & schedule 2 ofthe IP Rlesulaion OM mentioned in schedule 13D of the IP Regulation and encending the desholgs set by that
Unless you answered “none of the above”, the
application triggers referral to QT as a schedule.
conourrence agency. CL (ii) reconfiguring a tot—
C1 (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
(D (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m2 or
greater;
CJ (c) on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(1 (d) — on tand that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
C1 (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
C1 (f) for a residential purpose resulting in 100 or more allotments.
C1 (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—
(a) _ is completely or partly within rai! corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(1 (b) is completely or partly within future railway land, or a railway tunnel easement;
{1 (c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
&X] (iv) none of the above.
Moonie to Brisbane pipeline 24. The application involves the easement for the construction or operation of the Moonie to

For more information refer to schedute 2of the IP
Regulation.

Unless you answered “none of the above”, the
application tiggers referral to the holder of
pipeline licence No 1 issued under the Pefrofeum
Act 1923, currently Santos QNT Pty Ltd, for
advice.

 

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

CO (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

( (ii) reconfiguring a lot

C1 (ili) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

wv (iv) none of the above.

 

Page 8

Log in to download the original (07_1452 - Preliminary building works assessable against planning scheme [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.