Skip to the record
Search everything, all in one place.

Original source · versioned page text

07/1452 - Preliminary building works assessable against planning scheme [As Published]

of 23

Page text read automatically using OCR, there may be inaccuracies

INTEGRATED PLANNING ACT 1997
Works in tidal areas, coasta!

management districts and fish habitat
areas

{fyou answered YES to QS, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.

\f you answered YES to QS and ticked box j) in
Q6, your application is required to be referred to
the EPA.

Note: if specified works are proposed in a local
goverment area, it is prescribed tidal work — the
relevant local government will be the
assessment manager with the EPA as a
concurrence agency

If you answered YES to Q5, and ticked box ti) or
iit} in Q6, your application requires referral to
DPIF.
ifyou answered NO to Q5 and ticked box i) in
Q6, the application will not be accepted.

If you answered NO to Q5, ticked box ii) in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or if a
required permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Appiications for purposes other
than specified works or as described above will
not be accepted.

Ifyou answered NO at Q5 and ticked box iii) in
Q6, the application may be made If the works are
ina PA. These applications must be assessed
against and must comply with the Wild Rivers
Coda. The application will not be accepted if the
development is proposed to be located in a HPA.
For more information about specified works refer
to Guide 27

Residential, commercial or industrial
development

(fyou answered YES to Q7, your application is
not subject to wild river requirements. Provided
there are no other aspects of this development

that require assessment against the relevant wild! §

river declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.

If you answered NO to Q7 and ticked either box
i) cr ii) in Q8, the assessing agency is the
relevant local government. The application must
be assessed against and must comply with the
Wild Rivers Code.

5.

IDAS Assessment Checklist, Version 20, 2 April 2007

Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)

A NO Clyes

The application is for one or more of the following:

[7] i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); OF

oO ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1); OF

oO iti) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).

{s the application for residential, commercial or industrial development in a designated urban

area?
ClyYes

(fl No

If NO, does the application for residential, commercial or industrial development involve:

(i) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or

oO ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).

 

 

Animal husbandry activities

Ifyou answered YES to Q9 your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Apptications for animal husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animat
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.

 

Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?

J No

oO YES (ensure you have completed Part R of Form 1)

 

 

Agricultural activities

Ifyou answered YES to Q10, your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for agricultural activities wilt
not be accepted if proposed in a HPA. For more
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
27.

The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques Is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.

 

 

10.

11,

Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
a PA?

Sno

If YES is the application for:
(1 i) a material change of use; or
Q ii) operational works.

(21 YES (ensure you have completed Part Q of Form 1)

Page 12

Log in to download the original (07_1452 - Preliminary building works assessable against planning scheme [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.