INTEGRATED PLANNING ACT 1997
Works that take overland flow water

The relevant wild river declaration will state
works that take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.

(f you ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

If you ticked Q13 ii) an application is not required
to be made however the works must comply with
tha relevant self-assessable section of the Witd
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

If you ticked Q13 iii) your application is not
subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted,

12.

13.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?

NO (21 YES (ensure you have completed Part Ks of Fonn 1)

If YES, is the application for works stated in the relevant wild river declaration to be?
(J i) assessable works

J ii) self-assessable works

LD) iti) exempt works

 

Works that interfere with overland
flow water

The relevant wild river declaration will state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.

If you ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code,

\f you ticked Q15 ii) an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

If you ticked Q15 iii) your application is not
subject to wild river requirements,

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will nat be accepted.

14.

an the application involve works that interfere with overland flow water in a FMA?
NO

Oo YES (ensure you have completed Part Kio of Form 1)

\f YES, is the application for works stated in the relevant wild rivers declaration to be?
(1 i) assessable works

(ii) self-assessable works

(J iii) exempt works

 

Waterway barrier works
Applications for building or ralsing waterway
barrier works in a HPA will nat be accepted.

Ifyou answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

Aquaculture (non ERA)

Applications for aquaculture in a HPA will not be
accepted,

\fyou answered YES to Q17, your application
must be assessed by DPIF against the Witd
Rivers Code and must comply with the code.

16.

Does the application involve building or raising waterway barrier works in a PA?
BS NO oO YES (ensure you have completed Part O3 of Form 1)

Does the application involve aquaculture in a PA?

RfINo

(1 YES (ensure you have completed Part O: of Form 1)

 

Works that interfere with water in a
watercourse

Note: If the development is proposed in a HPA,
applications for all works that interfere with water
in a watercourse (including dams or weirs,
stream realignment or stream diversion) will not
be accepted.

tn a PA, apptications for instream dams and
weirs may be accepted in nominated waterways.
If you ticked box if) in Q19, your application will
not be accepted.

Note: Operational works outside a HPA or
nominated waterway ara not subject to wild
river requirements.

More information and tocations of nominated
waterways is available by contact NRW,
accessing the department's website
wwww.nnw.ald.gov.au or contacting the
department by email on:
[email protected] the application involve operational works that interfere with water in a watercourse that is in
nominated waterway in a PA?
vo CJ YES (ensure you have completed the relevant Part K of Form 1)

If YES,
O i) The application is for an instream dam or weir; or

oO ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

Page 13

Log in to download the original (07_1452 - Preliminary building works assessable against planning scheme [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.