PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 JULY 2022
15. Any street fencing must be set back an average of at least 1 metre from the front
property boundary. Any fencing on the front boundary must not exceed a maximum
height of 1.8m.
16. The area of land between the fence and the front property boundary must be densely
landscaped to obscure any fencing from the street.
Landscaping Works
24. The existing vegetation in the road reserve is to be retained and managed as per the
findings and recommendations of the Arborist Report prepared by Arboriculture
Contractors Australia Pty Ltd, dated 27 April 2022. A qualified person* must be present
if works are occurring within the Tree Protection Zone.
Should one of the mature trees are to be removed, reasonable grounds must be given
by the qualified person*, and substituted with additional Baeckea virgata or Banksia
integrifolia with a minimum pot size of 100L or greater.
OPERATIONAL WORKS
Approved Plans
When conditions must be complied with
46. Development undertaken in accordance with this Preliminary Approval must generally
comply with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions, where there is conflict
between the approved plans and conditions of approval, the condition prevails.
Plan No. Rev. Plan/Document Name Date
188-002-002-B B General Notes prepared by Bax Engineering 7 February 2022
188- 002-100 B Site Layout Plan prepared by Bax Engineering 7 February 2022
188-002-200 B Earthworks Layout Plan prepared by Bax 7 February 2022
Engineering
188-002-201 B Earthworks Sections prepared by Bax 7 February 2022
Engineering
188-002-300 B Grading & Drainage Layout Plan (as annotated 7 February 2022
by Council) prepared by Bax Engineering
188-002-301 B Pavement Layout Plan prepared by Bax 7 February 2022
Engineering
188-002-302 B Sign & Line Marking Layout Plan prepared by 7 February 2022
Bax Engineering
188-002-401 B Drainage Longitudinal Section prepared by Bax 7 February 2022
Engineering
- - Arborist Tree Assessment Report by 27 April 2022
Arboriculture Contractors Australia Pty Ltd
1622_L01-01_04 4 Landscape Notes & Schedules prepared by 19 May 2022
Blackburne Jackson
1622_L03-01_04 4 Landscape Planting Plans prepared by 19 May 2022
Blackburne Jackson
1622_L07-01_04 1 Landscape Details prepared by Blackburne 19 May 2022
Jackson
During Construction
Engineering
56. All works must be constructed and work procedure undertaken in accordance with:
Page 16 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.