Original source · versioned page text
2022-07-12 Planning & Environment Meeting Agenda
The original of this document is very large (26.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 JULY 2022
Approved Documents
4. Development must be undertaken strictly under the approved documents listed in the
following table unless otherwise amended by these conditions.
Document
• Tectonic report “Geotechnical Investigation, Proposed residence 66 Seaview Terrace,
Sunshine Beach”, reference 21370-001-Rev 1 dated 28 April 2022
• Royal Haskoing DHV report ‘Report 66 Seaview Terrace, Sunshine Beach Coastal
Hazards Assessment, reference PA2906-RHD-ZZ-XX-RP-Z-0001 dated 3 June 2022
Built form
5. The maximum height of the development must not exceed 8 metres above ground level
in accordance with the approved plans.
6. Certification must be submitted to Council from a Licensed Surveyor which certifies
that the building does not exceed the maximum height requirement of this Decision
Notice.
7. The proposed Detached House must be located on the site, as shown on the Site Plan,
Drawing No. 100.00, Revision G. The Detached House is not to be located closer than
10.5m to the seaward boundary, except for the cantilevered part of the building which
is not to extend closer than 7.5m to the seaward boundary. Certification of the location
of the Detached House, including the cantilevered section from the seaward boundary,
is to be provided by a licenced surveyor before the issue of a final classification for the
Detached House by the building certifier. The certification must be submitted to
Council.
Currency Period
8. This development approval lapses if the use has not happened by 21 July 2028, unless
an application to extend the currency period is approved by Council.
Performance Bond
9. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
must be submitted to Council, to secure performance of all conditions of this approval,
prior to the issue of a Development Permit for Building Works. The cash bond or trading
bank guarantee will be returned on performance of the conditions of approval less any
costs incurred by Council in respect of enforcing performance of this permit. Council
reserves the right to call upon the bond or guaranteed sum to effect compliance with
conditions.
Landscaping
10. A minimum of 20% of the site must be retained as soft landscaping.
11. To screen the development, screening vegetation must be planted for the full length of
the north and south boundaries, with the exception of the bin/gas/bike store area, in
accordance with Council’s Planning Scheme Policy PSP2 - Landscaping. The planted
vegetation must have a minimum pot size of 200mm and consist of native, endemic
species with a mature height of not less than 8 metres and a maximum spacing of 2
metre centres.
12. A mix of native landscaping, such as ground covers, shrubs and trees, is provided for
a width of 5 metres from the seaward or rear boundary of the site. The planted
vegetation must have a minimum pot size of 200mm and consist of native, endemic
species as per Table 3.1 & 3.2 of PSP2 Landscaping for suitable coastal species. The
planted vegetation must be planted at the following density:
a. trees must have a maximum spacing of 6m;
Page 96 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.