PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 12 JULY 2022
24. Landscaping at the rear of the property and the crest of the existing dune slope shall
be limited to a maximum surcharge of 5kPa unless a site-specific slope stability
analysis is carried out to demonstrate that higher loads are acceptable.
25. Under no circumstances shall building materials be temporarily stockpiled in the area
of the crest of the existing dune slope or on the slope.
26. Discharge of concentrated stormwater flows onto the dune slope must be avoided, and
under no circumstances will subsurface disposal of water be permitted using infiltration
pits.
27. Stormwater runoff from gutters, down-pipes, driveways, and paved areas must be
collected and directed by pipes into the Council stormwater system along Seaview
Terrace.
28. The existing dune slope and any areas disturbed by the construction of the proposed
development shall be revegetated as soon as possible to reduce the potential for
erosion.
Earthworks
29. Earthworks required on-site must be carried out in accordance with Council’s Planning
Scheme Policy PSP6 Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or concentrate or direct overland flow on to an
adjoining property.
30. All earthworks carried out on site must not affect the structural stability of the adjoining
lands and/or buildings and/or structures and/or services.
31. All earthworks and associated retaining structures/batters, both above and below
ground level, both temporary and permanent, must be wholly contained within the
subject site unless written permission from the respective landowner(s) is provided to
Council.
32. All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments.
Significant Weather Event
33. Should a significant weather event occur which results in substantial erosion within the
site, and undermines the structure and/or renders the Detached House uninhabitable,
the owner must
a. Immediately secure the perimeter of the property to prevent unauthorised access
and then undertake necessary works upon the land to make the detached house
safe and suitable for habitation in a timely manner.
i. Any work proposed must be designed to ensure that the work will not cause
adverse impacts on other lands or on coastal processes.
ii. Rock, concrete and like hard materials must not be used for the
construction of beach protection works.
iii. Any work proposed to be carried out must be undertaken in accordance
with Development Permit for Operational Works.
b. or remove the Detached House and all associated structures including the
footpath crossover and make the land safe at no cost to the Council.
Site Access and Driveways
34. A sealed access driveway must be provided from the existing formation in Seaview
Terrace to all parking and manoeuvring areas of the development. The works must be
undertaken in accordance with an Operational Works approval and must include a
driveway located generally in accordance with the approved plans.
Page 98 of 150
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.