Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2022-07-12 Planning & Environment Meeting Agenda

of 150

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (26.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       12 JULY 2022


    24.   Landscaping at the rear of the property and the crest of the existing dune slope shall
          be limited to a maximum surcharge of 5kPa unless a site-specific slope stability
          analysis is carried out to demonstrate that higher loads are acceptable.
    25.   Under no circumstances shall building materials be temporarily stockpiled in the area
          of the crest of the existing dune slope or on the slope.
    26.   Discharge of concentrated stormwater flows onto the dune slope must be avoided, and
          under no circumstances will subsurface disposal of water be permitted using infiltration
          pits.
    27.   Stormwater runoff from gutters, down-pipes, driveways, and paved areas must be
          collected and directed by pipes into the Council stormwater system along Seaview
          Terrace.
    28.   The existing dune slope and any areas disturbed by the construction of the proposed
          development shall be revegetated as soon as possible to reduce the potential for
          erosion.
    Earthworks
    29.   Earthworks required on-site must be carried out in accordance with Council’s Planning
          Scheme Policy PSP6 Engineering Design Standards, so as not to cause the additional
          ponding of water on any adjoining lands or concentrate or direct overland flow on to an
          adjoining property.
    30.   All earthworks carried out on site must not affect the structural stability of the adjoining
          lands and/or buildings and/or structures and/or services.
    31.   All earthworks and associated retaining structures/batters, both above and below
          ground level, both temporary and permanent, must be wholly contained within the
          subject site unless written permission from the respective landowner(s) is provided to
          Council.
    32.   All earthworks must be undertaken in accordance with the provisions of Australian
          Standard AS3798: Guidelines on Earthworks for Commercial and Residential
          Developments.
    Significant Weather Event
    33.   Should a significant weather event occur which results in substantial erosion within the
          site, and undermines the structure and/or renders the Detached House uninhabitable,
          the owner must
          a.    Immediately secure the perimeter of the property to prevent unauthorised access
                and then undertake necessary works upon the land to make the detached house
                safe and suitable for habitation in a timely manner.
                i.     Any work proposed must be designed to ensure that the work will not cause
                       adverse impacts on other lands or on coastal processes.
                ii.    Rock, concrete and like hard materials must not be used for the
                       construction of beach protection works.
                iii.   Any work proposed to be carried out must be undertaken in accordance
                       with Development Permit for Operational Works.
          b.  or remove the Detached House and all associated structures including the
              footpath crossover and make the land safe at no cost to the Council.
    Site Access and Driveways
    34.   A sealed access driveway must be provided from the existing formation in Seaview
          Terrace to all parking and manoeuvring areas of the development. The works must be
          undertaken in accordance with an Operational Works approval and must include a
          driveway located generally in accordance with the approved plans.

                                                                                     Page 98 of 150
Log in to download the original file

2022-07-12 Planning & Environment Meeting Agenda(PDF, 25MB).pdf · 26.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.